Revision history of "Sewage sewerage and wastewater treatment plant Drhovy" (Q60601)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:1011:10, 12 October 2024DG Regio talk contribs 51,218 bytes +11 Changed label, description and/or aliases in pt
  • curprev 11:1011:10, 12 October 2024DG Regio talk contribs 51,207 bytes +40 Set a claim value: summary (P836): Nova construção de uma estação de tratamento de águas residuais e de esgotos, que será concluída na estação de serviço central, na extremidade oriental da aldeia, com deslocação para uma nova estação de tratamento de águas residuais. A nova ETAR será colocada sob a aldeia na margem da lagoa de Drhovský, na qual serão descarregadas as águas residuais tratadas. O projeto irá construir um sistema de esgotos gravitacionais de 1963 m de comprimento, 214...

20 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 08:1808:18, 24 July 2022DG Regio talk contribs 48,209 bytes +27,910 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4621:46, 2 December 2021DG Regio talk contribs 15,528 bytes +1,338 Created claim: summary (P836): Neubau von Kläranlagen und Kläranlagen, der in einer zentralen Pumpstation am östlichen Rand des Dorfes mit Verdrängung in eine neue Kläranlage fertiggestellt wird. Das neue WWTP befindet sich unterhalb des Dorfes am Ufer des Drhovský Pond, in den das behandelte Abwasser abgeführt wird. Das Projekt wird ein Abwassersystem in der Länge von 1 963 m, eine Druckabwasseranlage von 214 Metern, Tankstellen 1 und 2, eine Entladungsserie in der Länge 306...
  • curprev 21:4621:46, 2 December 2021DG Regio talk contribs 14,190 bytes +100 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:5122:51, 28 November 2021DG Regio talk contribs 14,090 bytes +1,543 Created claim: summary (P836): Construction d’un nouveau système d’égouts et d’une station de traitement des eaux usées, qui sera achevée dans une station de pompage centrale située à l’extrémité est du village et déplacée vers une nouvelle station d’épuration des eaux usées. La nouvelle station d’épuration sera située au-dessous du village, sur les rives de l’étang Drhovský, dans lequel les eaux usées traitées seront rejetées. Le projet permettra de construire un système d’a...
  • curprev 22:5122:51, 28 November 2021DG Regio talk contribs 12,547 bytes +151 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 10:4510:45, 23 October 2020DG Regio talk contribs 12,845 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:4510:45, 23 October 2020DG Regio talk contribs 12,733 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:4510:45, 23 October 2020DG Regio talk contribs 12,847 bytes +1,359 Created claim: summary (P836): New building of sewage sewage and sewage treatment plant, which will be completed in the central petrol station on the eastern edge of the village with displacement to a new sewage treatment plant. The new WWTP will be placed under the village on the shore of Drhovský pond, into which the treated waste water will be discharged. The project will build a gravitational sewage sewage system of 1963 m long, 214 metres pressure sewerage, pumping stati...
  • curprev 10:4510:45, 23 October 2020DG Regio talk contribs 11,488 bytes −1,006 Removed claim: summary (P836): The new construction of the sewage sewerage system and the wastewater treatment plant, which will be finished at the central filling station on the east of the municipality, with a displacement to a new waste water treatment plant. The new waste water treatment plant will be placed under a municipality in the bank of the Drhovah’s pond to which the treated waste water is discharged. The project will build the acceleration of the gravitational...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:5710:57, 26 February 2020DG Regio talk contribs 11,225 bytes +1,006 Created claim: summary (P836): The new construction of the sewage sewerage system and the wastewater treatment plant, which will be finished at the central filling station on the east of the municipality, with a displacement to a new waste water treatment plant. The new waste water treatment plant will be placed under a municipality in the bank of the Drhovah’s pond to which the treated waste water is discharged. The project will build the acceleration of the gravitational se...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020