Revision history of "Kraslice – extension of sewer system stage III" (Q60490)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3308:33, 13 October 2024DG Regio talk contribs 47,290 bytes +2 Changed label, description and/or aliases in pt
  • curprev 08:3308:33, 13 October 2024DG Regio talk contribs 47,288 bytes −9 Set a claim value: summary (P836): O projeto consiste em 2 documentos de projeto relativos à construção de novos esgotos em duas localidades de Kraslice. Todos os esgotos serão ligados ao sistema municipal de esgotos encerrado na estação de tratamento de águas residuais municipais de Kraslice. É uma extensão do esgoto de Horní Předměstí e mais adiante na rua. Mánes e ul. Prado (como parte do sistema de drenagem Zelená Hora – Tisová Stoka C e C2).

7 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 08:0408:04, 24 July 2022DG Regio talk contribs 45,364 bytes +26,211 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4821:48, 2 December 2021DG Regio talk contribs 15,002 bytes +1,269 Created claim: summary (P836): Das Projekt besteht aus zwei Projektdokumentationen, die den Bau neuer Abwasserkanäle in zwei Ortschaften der Stadt Kraslice lösen. Alle Abwasserkanäle werden an das städtische Abwassersystem angeschlossen, das im kommunalen WWTP in Kraslice endet. Es handelt sich um eine Erweiterung des Kanalisationssystems des Oberen Vororts und weiter auf die ul. Mánesova und ul. Wiese (im Rahmen der Kanalisation Zelená Hora – Tisová Stoka C und C2)., transla...
  • curprev 21:4821:48, 2 December 2021DG Regio talk contribs 13,733 bytes +110 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:4722:47, 28 November 2021DG Regio talk contribs 13,623 bytes +1,304 Created claim: summary (P836): Le projet consiste en 2 documents de projet, qui résout la construction de nouveaux égouts dans deux localités de la ville de Kraslice. Tous les égouts d’égouts seront raccordés au réseau d’égouts urbains terminé dans la station d’épuration municipale de Kraslice. Il s’agit d’une extension du réseau d’assainissement de la banlieue supérieure et plus loin de l’ul. Mánesova et ul. Prairie (dans le cadre des égouts Zelená Hora — Tisová Stoka C et C...
  • curprev 22:4722:47, 28 November 2021DG Regio talk contribs 12,319 bytes +116 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 12,652 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 12,545 bytes −107 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 12,652 bytes +1,260 Created claim: summary (P836): The project consists of 2 project documentation dealing with the construction of new sewers in two localities of Kraslice. All the sewer drains will be connected to the municipal sewer system terminated in the municipal wastewater treatment plant in Kraslice. It is an extension of the sewerage of Horní Předměstí and further on the street. Mánes and ul. Meadow (as part of the drainage system Zelená Hora – Tisová Stoka C and C2)., translated_summary
  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 11,392 bytes −791 Removed claim: summary (P836): The project consists of 2 project dossiers to deal with the construction of new sewers in two town halls. All wastewater management addressed will be connected to the municipal sewerage system completed in the municipal waste wastewater treatment plant in Kraków. These are the extension of the Upper Transmission System and the ul. Mánesova and ul. Lutte (in the framework of the Green Hora sewerage stoka C and C2)., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:4010:40, 26 February 2020DG Regio talk contribs 10,915 bytes +791 Created claim: summary (P836): The project consists of 2 project dossiers to deal with the construction of new sewers in two town halls. All wastewater management addressed will be connected to the municipal sewerage system completed in the municipal waste wastewater treatment plant in Kraków. These are the extension of the Upper Transmission System and the ul. Mánesova and ul. Lutte (in the framework of the Green Hora sewerage stoka C and C2)., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020