Revision history of "Sewerage and WWTP Hlinsko pod Hostýnem" (Q60331)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 07:4707:47, 24 July 2022DG Regio talk contribs 48,461 bytes +28,217 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3521:35, 2 December 2021DG Regio talk contribs 15,600 bytes +1,413 Created claim: summary (P836): Ziel des Projekts in Hlinsk pod Hostýnem ist der Bau eines neuen Kanalisationssystems und die Abscheidung des bestehenden einheitlichen Abwassersystems mit der Einführung in die neu gestaltete Pumpstation ČS1 mit anschließender Abwasserübertragung (in der ersten Stufe für 55 % der südlichen Entwicklung) in eine neue Kläranlage im k.ú. Hlinsko pod Hostýnem – S. 970/23 und 970/13. Hier findet die mechanisch-biologische Behandlung des OV statt und...
  • curprev 21:3521:35, 2 December 2021DG Regio talk contribs 14,187 bytes +102 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:4622:46, 28 November 2021DG Regio talk contribs 14,085 bytes +1,508 Created claim: summary (P836): L’objectif du projet à Hlinsk pod Hostýnem est la construction d’un nouveau système d’assainissement et le captage du système d’assainissement unifié existant avec l’introduction de la nouvelle station de pompage ČS1 avec transfert ultérieur des eaux usées (dans la première étape pour 55 % du développement méridional) vers une nouvelle station de traitement des eaux usées située dans le k.ú. Hlinsko pod Hostýnem — p. 970/23 et 970/13. Ici, le tr...
  • curprev 22:4622:46, 28 November 2021DG Regio talk contribs 12,577 bytes +121 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 12:1312:13, 23 October 2020DG Regio talk contribs 12,905 bytes +98 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1312:13, 23 October 2020DG Regio talk contribs 12,807 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1312:13, 23 October 2020DG Regio talk contribs 12,921 bytes +1,399 Created claim: summary (P836): The purpose of the project is to build a new sewerage system in Hlinsko pod Hostýnem and to capture the existing unified sewerage system with the introduction to the newly designed petrol station ČS1 with subsequent overdraft of waste water (in I.stage for 55 % of the southern construction) to the new wastewater treatment plant located in k.ú. Hlinsko pod Hostýnem – p. 970/23 and 970/13. There will be a mechanical-biological treatment of the OV...
  • curprev 12:1312:13, 23 October 2020DG Regio talk contribs 11,522 bytes −1,042 Removed claim: summary (P836): The purpose of the project is to build a new sewerage system in Hlinsk under Hostýn and the collection of the existing uniform sewerage system is carried out in the newly proposed ČS1 service station, followed by a transfer of waste water (in I.1 for 55 % of southern building) to a new treatment plant of the wastewater treatment plant located in the cadastral district of the region. Hlinsko under Hostýnem — Nos 970/23 and 970/13. Here there wi...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:3010:30, 26 February 2020DG Regio talk contribs 11,289 bytes +1,042 Created claim: summary (P836): The purpose of the project is to build a new sewerage system in Hlinsk under Hostýn and the collection of the existing uniform sewerage system is carried out in the newly proposed ČS1 service station, followed by a transfer of waste water (in I.1 for 55 % of southern building) to a new treatment plant of the wastewater treatment plant located in the cadastral district of the region. Hlinsko under Hostýnem — Nos 970/23 and 970/13. Here there will...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020