Revision history of "Restoration of Goethe’s prospect in Karlovy Vary" (Q60268)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 23:0423:04, 12 October 2024DG Regio talk contribs 53,193 bytes +3 Changed label, description and/or aliases in pt
  • curprev 23:0423:04, 12 October 2024DG Regio talk contribs 53,190 bytes −4 Set a claim value: summary (P836): A principal atividade do projeto é a restauração do monumento (reconstrução e modificações de construção, remoção de elementos de construção não originais e não conformes e implementação de redes de engenharia), o grupo-alvo do projeto são residentes locais e visitantes da cidade de Karlovy Vary, os benefícios são a reabertura do interior e modificação do exterior do edifício e preservação do caráter do monumento para as gerações futuras. O edifício...

23 March 2024

15 January 2024

19 June 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 07:4007:40, 24 July 2022DG Regio talk contribs 50,520 bytes +29,271 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3221:32, 2 December 2021DG Regio talk contribs 16,366 bytes +1,491 Created claim: summary (P836): Die Haupttätigkeit des Projekts ist die Restaurierung von Denkmälern (Rekonstruktion und Umbauten, Entfernung von nicht originären und nicht konformen Bauelementen und die Realisierung von Tiefbaunetzen), die Zielgruppe des Projekts sind die Anwohner und Besucher der Stadt Karlovy Vary, der Vorteil ist die Wiedereröffnung des Innenraums und die Modifikation der Außenseite des Gebäudes und die Erhaltung des Charakters des Denkmals auch für zukünf...
  • curprev 21:3221:32, 2 December 2021DG Regio talk contribs 14,875 bytes +115 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:4522:45, 28 November 2021DG Regio talk contribs 14,760 bytes +1,558 Created claim: summary (P836): L’activité principale du projet est la restauration des monuments (reconstruction et modifications de construction, suppression des éléments de construction non originaux et non conformes et la mise en œuvre de réseaux de génie civil), le groupe cible du projet sont les résidents locaux et les visiteurs de la ville de Karlovy Vary, l’avantage est la réouverture de l’intérieur et la modification de l’extérieur du bâtiment et la préservation du ca...
  • curprev 22:4522:45, 28 November 2021DG Regio talk contribs 13,202 bytes +114 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 12:0112:01, 23 October 2020DG Regio talk contribs 13,537 bytes +109 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0112:01, 23 October 2020DG Regio talk contribs 13,428 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0112:01, 23 October 2020DG Regio talk contribs 13,530 bytes +1,490 Created claim: summary (P836): The main activity of the project is the restoration of the monument (reconstruction and construction modifications, removal of non-original and non-compliant building elements and implementation of engineering networks), the target group of the project are local residents and visitors of the city Karlovy Vary, the benefits are the reopening of the interior and modification of the exterior of the building and preservation of the character of the...
  • curprev 12:0112:01, 23 October 2020DG Regio talk contribs 12,040 bytes −963 Removed claim: summary (P836): The main activity of the project is the restoration of monuments (reconstruction and construction, the removal of non-originating and non-compliant building blocks and the realisation of engineering networks), the project’s target group is the local population and visitors of the city of Karlovy Vary, making it easier to access the internal and exterior of the building and preserving the memory of the future. The object is registered in the ce...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2211:22, 26 February 2020DG Regio talk contribs 11,222 bytes +963 Created claim: summary (P836): The main activity of the project is the restoration of monuments (reconstruction and construction, the removal of non-originating and non-compliant building blocks and the realisation of engineering networks), the project’s target group is the local population and visitors of the city of Karlovy Vary, making it easier to access the internal and exterior of the building and preserving the memory of the future. The object is registered in the cent...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020