Revision history of "Completion of the water supply Vonoklasy" (Q60140)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:3120:31, 12 October 2024DG Regio talk contribs 44,040 bytes −3 Set a claim value: summary (P836): O projeto aborda a interligação de duas redes de abastecimento de água existentes no município de Vonoklasy. Instalação do tanque de acumulação (16 m3), novo equipamento tecnológico das obras hidráulicas para o sistema de interligação de ambas as obras hidráulicas e construção de uma linha de água na rua V Zátiší.

22 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 07:2507:25, 24 July 2022DG Regio talk contribs 41,598 bytes +22,923 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:1921:19, 2 December 2021DG Regio talk contribs 14,903 bytes +1,139 Created claim: summary (P836): Das Projekt befasst sich mit der Vernetzung von zwei bestehenden Wasserwerken in der Gemeinde Vonoklasy. Installation des Speicherbehälters (16 m³), neue technologische Ausstattung der Wasserwerke für das System der Zusammenschaltung von Wasserwerken und Bau der Wasserversorgungsleitung in der Straße V Zátiší., translated_summary
  • curprev 21:1921:19, 2 December 2021DG Regio talk contribs 13,764 bytes +101 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:4522:45, 28 November 2021DG Regio talk contribs 13,663 bytes +1,191 Created claim: summary (P836): Le projet porte sur l’interconnexion de deux réseaux d’aqueduc existants dans la municipalité de Vonoklasy. Installation du réservoir de stockage (16 m³), nouvel équipement technologique des réseaux d’aqueduc pour le système d’interconnexion des deux ouvrages d’eau et la construction de la conduite d’approvisionnement en eau dans la rue V Zátiší., translated_summary
  • curprev 22:4522:45, 28 November 2021DG Regio talk contribs 12,472 bytes +113 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:4411:44, 23 October 2020DG Regio talk contribs 12,808 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4411:44, 23 October 2020DG Regio talk contribs 12,709 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4411:44, 23 October 2020DG Regio talk contribs 12,821 bytes +1,118 Created claim: summary (P836): The project addresses the interconnection of two existing waterworks in the municipality of Vonoklasy. Installation of the accumulation tank (16 m³), new technological equipment of the waterworks for the system of interconnection of both waterworks and building a water line in V Zátiší street., translated_summary
  • curprev 11:4411:44, 23 October 2020DG Regio talk contribs 11,703 bytes −668 Removed claim: summary (P836): The project addresses the interconnection of the two existing waterbodies in the municipality of Vonoklasy. The installation of the storage tank (16 m³), the new technological development of the water tower system for the two water bodies and the construction of the water system in the street., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:2111:21, 26 February 2020DG Regio talk contribs 11,097 bytes +668 Created claim: summary (P836): The project addresses the interconnection of the two existing waterbodies in the municipality of Vonoklasy. The installation of the storage tank (16 m³), the new technological development of the water tower system for the two water bodies and the construction of the water system in the street., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020