Revision history of "Sewage sewerage and sewage treatment plant Ponds" (Q60020)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:3020:30, 12 October 2024DG Regio talk contribs 52,143 bytes +18 Changed label, description and/or aliases in pt
  • curprev 20:3020:30, 12 October 2024DG Regio talk contribs 52,125 bytes +9 Set a claim value: summary (P836): O projeto «estação de esgotos e estação de tratamento de águas residuais de Rybníky» resolve a drenagem e a eliminação de águas residuais na aldeia de Rybníky. Este projecto propõe a construção de um sistema de esgotos de 3489,28 m de comprimento e a construção de uma nova estação de tratamento de esgotos com 450 EO. Os esgotos de esgotos sob pressão são projetados a partir de tubos de polietileno de três camadas PE 100/SDR 11 nos perfis D = 50-110...

7 March 2024

15 January 2024

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 07:1207:12, 24 July 2022DG Regio talk contribs 49,157 bytes +29,107 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:0221:02, 2 December 2021DG Regio talk contribs 15,549 bytes +1,372 Created claim: summary (P836): Das Projekt „Sewage Kanalisation und WWTP Rybníky“ beschäftigt sich mit der Sammlung und Entsorgung von Abwasser im Dorf Rybníky. Dieses Projekt schlägt den Bau einer 3 489,28 m langen Kanalisation und den Bau einer neuen Kläranlage mit 450 EO vor. Die Kanalisationen sind aus dreischichtigen Rohren aus Polyethylen PE 100/SDR 11 in Profilen D = 50-110 mm ausgelegt. Die vorgeschlagene biologische Kläranlagetechnologie für eine Kapazität von 450 EO...
  • curprev 21:0221:02, 2 December 2021DG Regio talk contribs 14,177 bytes +95 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:3922:39, 28 November 2021DG Regio talk contribs 14,082 bytes +1,483 Created claim: summary (P836): Le projet «assainissement des eaux usées et station d’épuration Rybníky» porte sur la collecte et l’élimination des eaux usées dans le village de Rybníky. Ce projet propose la construction d’un réseau d’égouts d’une longueur de 3 489,28 m et la construction d’une nouvelle station de traitement des eaux usées de 450 EO. Les égouts sont conçus à partir de tuyaux à trois couches en polyéthylène PE 100/SDR 11 dans des profilés D = 50-110 mm. La tech...
  • curprev 22:3922:39, 28 November 2021DG Regio talk contribs 12,599 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 17:4517:45, 23 October 2020DG Regio talk contribs 12,924 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:4517:45, 23 October 2020DG Regio talk contribs 12,817 bytes −90 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:4517:45, 23 October 2020DG Regio talk contribs 12,907 bytes +1,422 Created claim: summary (P836): The project “swage sewerage and wastewater treatment plant Rybníky” solves the drainage and disposal of waste water in the village of Rybníky. This project proposes the construction of a 3489.28 m long sewage sewage sewage system and the construction of a new sewage treatment plant with 450 EO. The sewers of pressure sewers are designed from three-layer polyethylene tubes PE 100/SDR 11 in profiles D = 50-110 mm. The proposed biological sewage tr...
  • curprev 17:4517:45, 23 October 2020DG Regio talk contribs 11,485 bytes −959 Removed claim: summary (P836): The project ‘sewage sewage and ČOV Rybníky’ (Rybníky ČOV) deals with the collection and disposal of waste water in Rybníky municipality. This project proposes the construction of a 3 489.28 m long burst pressure sewer and the construction of a new sewage treatment plant with 450 EO. The pressure sewer stacks are drawn from the three layer tubes of polyethylene PE 100/SDR 11 in the profiles D = 50-110 mm. The proposed technology of a biological...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:1411:14, 26 February 2020DG Regio talk contribs 11,175 bytes +959 Created claim: summary (P836): The project ‘sewage sewage and ČOV Rybníky’ (Rybníky ČOV) deals with the collection and disposal of waste water in Rybníky municipality. This project proposes the construction of a 3 489.28 m long burst pressure sewer and the construction of a new sewage treatment plant with 450 EO. The pressure sewer stacks are drawn from the three layer tubes of polyethylene PE 100/SDR 11 in the profiles D = 50-110 mm. The proposed technology of a biological w...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020