Revision history of "Wastewater disposal Senička" (Q59954)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:0911:09, 12 October 2024DG Regio talk contribs 45,525 bytes +5 Changed label, description and/or aliases in pt
  • curprev 11:0911:09, 12 October 2024DG Regio talk contribs 45,520 bytes +9 Set a claim value: summary (P836): O projeto resolve a construção de um novo sistema de esgotos na aldeia de Senička, composto por ETAR, lagoas biológicas, esgotos, incluindo ligações domésticas. O sistema de esgotos atual será utilizado para a drenagem das águas pluviais. A pré-limpeza mecânica consiste em favos com armadilha de areia e unidade biológica para 350 EO.

22 March 2024

15 January 2024

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 07:0407:04, 24 July 2022DG Regio talk contribs 42,545 bytes +24,092 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 15,480 bytes +1,168 Created claim: summary (P836): Das Projekt löst den Bau eines neuen Abwassersystems im Dorf Senička, bestehend aus WWTP, biologischen Teichen, Kanalisation einschließlich Hausanschlüssen. Das bestehende Kanalisationssystem wird für die Entwässerung von Regenwasser eingesetzt. Mechanische Vorreinigung besteht aus Kämmen mit Sandfalle und biologischer Einheit für 350 EO., translated_summary
  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 14,312 bytes +86 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:3822:38, 28 November 2021DG Regio talk contribs 14,226 bytes +1,292 Created claim: summary (P836): Le projet résout la construction d’un nouveau système d’assainissement des eaux usées dans le village de Senička, composé d’une station d’épuration des eaux usées, d’étangs biologiques, d’un réseau d’assainissement, y compris de raccordements ménagers. Le système d’assainissement existant sera utilisé pour le drainage des eaux de pluie. Le pré-nettoyage mécanique se compose de peignes avec piège à sable et unité biologique pour 350 EO., translat...
  • curprev 22:3822:38, 28 November 2021DG Regio talk contribs 12,934 bytes +95 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:2211:22, 23 October 2020DG Regio talk contribs 13,292 bytes +87 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2211:22, 23 October 2020DG Regio talk contribs 13,205 bytes −99 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2211:22, 23 October 2020DG Regio talk contribs 13,304 bytes +1,132 Created claim: summary (P836): The project solves the construction of a new sewage system in the village of Senička consisting of WWTP, biological ponds, sewerage including house connections. The current sewer system will be used for rainwater drainage. Mechanical pre-cleaning consists of combs with sand trap and biological unit for 350 EO., translated_summary
  • curprev 11:2211:22, 23 October 2020DG Regio talk contribs 12,172 bytes −705 Removed claim: summary (P836): The project deals with the construction of a new sewage sewerage system in the municipality of Senička, consisting of ČOV, biological ponds, sewers including home connections. The existing sewerage system will be used for the collection of rainwater. Mechanical pretreatment consists of caps on sand and biological unit for 350 EO., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:0311:03, 26 February 2020DG Regio talk contribs 11,189 bytes +705 Created claim: summary (P836): The project deals with the construction of a new sewage sewerage system in the municipality of Senička, consisting of ČOV, biological ponds, sewers including home connections. The existing sewerage system will be used for the collection of rainwater. Mechanical pretreatment consists of caps on sand and biological unit for 350 EO., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020