Revision history of "TŘEBOŇ, OLD CLAY – DRAINAGE AND WWTP" (Q59912)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 07:0007:00, 24 July 2022DG Regio talk contribs 40,706 bytes +22,778 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 22:3822:38, 28 November 2021DG Regio talk contribs 13,114 bytes +1,153 Created claim: summary (P836): Le projet consiste en la construction d’une station d’épuration des eaux usées et d’un réseau d’égouts (avec une station-service) à Stará Hlín, la partie locale de la ville de Třeboň. 243 résidents permanents seront raccordés au nouveau réseau d’assainissement. La WWTP est conçue avec une capacité de 304 EO., translated_summary
  • curprev 22:3822:38, 28 November 2021DG Regio talk contribs 11,961 bytes +122 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:2111:21, 23 October 2020DG Regio talk contribs 12,288 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2111:21, 23 October 2020DG Regio talk contribs 12,189 bytes −129 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2111:21, 23 October 2020DG Regio talk contribs 12,318 bytes +1,087 Created claim: summary (P836): The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO., translated_summary
  • curprev 11:2111:21, 23 October 2020DG Regio talk contribs 11,231 bytes −661 Removed claim: summary (P836): The project consists of the construction of ČOV and the sewage system (with one service station) in Staré guarded, the local area of Třebose. 243 permanent living population will be linked to the new sewerage system. The wastewater treatment plant is designed with a capacity of 304 EO., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:0211:02, 26 February 2020DG Regio talk contribs 10,623 bytes +661 Created claim: summary (P836): The project consists of the construction of ČOV and the sewage system (with one service station) in Staré guarded, the local area of Třebose. 243 permanent living population will be linked to the new sewerage system. The wastewater treatment plant is designed with a capacity of 304 EO., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020