Revision history of "Flooding measures for the municipality of Hřensko" (Q59657)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:0611:06, 12 October 2024DG Regio talk contribs 51,468 bytes −14 Changed label, description and/or aliases in pt
  • curprev 11:0611:06, 12 October 2024DG Regio talk contribs 51,482 bytes +13 Set a claim value: summary (P836): O objeto do pedido de subvenção à OPE é a construção de um sistema de alerta e de alerta e a criação de um plano digital de inundações do município de Hřensko. O município está ameaçado por inundações e não dispõe de instrumentos e sistemas suficientes para prevenir os danos causados pelas inundações e gerir situações de crise. O tratamento da DPP e a construção do LVVS criarão uma ferramenta eficaz e fiável para prevenir e minimizar os eventos noci...

7 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 06:2506:25, 24 July 2022DG Regio talk contribs 48,743 bytes +28,758 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3421:34, 2 December 2021DG Regio talk contribs 15,203 bytes +1,486 Created claim: summary (P836): Gegenstand des Antrags auf Gewährung der OPEI ist der Bau eines Warn- und Warnsystems und die Erstellung eines digitalen Hochwasserplans der Gemeinde Hřensko. Die Gemeinde ist von Überschwemmungen bedroht und verfügt nicht über ein ausreichendes Instrument und System, um Hochwasserschäden zu verhindern und Krisensituationen zu bewältigen. Die Entwicklung des DPP und der Bau des GGB werden ein wirksames und zuverlässiges Instrument zur Verhütung...
  • curprev 21:3421:34, 2 December 2021DG Regio talk contribs 13,717 bytes +112 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:3922:39, 28 November 2021DG Regio talk contribs 13,605 bytes +1,519 Created claim: summary (P836): L’objet de la demande d’octroi de l’OPEI est la construction d’un système d’alerte et d’alerte et la création d’un plan d’inondation numérique de la municipalité de Hřensko. La municipalité est menacée par les inondations et ne dispose pas d’un outil et d’un système suffisants pour prévenir les dommages causés par les inondations et gérer les situations de crise. Le développement du DPP et la construction du SCI créeront un outil efficace et fia...
  • curprev 22:3922:39, 28 November 2021DG Regio talk contribs 12,086 bytes +132 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 10:3710:37, 23 October 2020DG Regio talk contribs 12,403 bytes +109 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3710:37, 23 October 2020DG Regio talk contribs 12,294 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3710:37, 23 October 2020DG Regio talk contribs 12,409 bytes +1,396 Created claim: summary (P836): The subject of the application for an OPE subsidy is the construction of a warning and warning system and the creation of a digital flood plan of the municipality of Hřensko. The municipality is threatened by floods and does not have a sufficient tool and system to prevent flood damage and manage crisis situations. Processing of DPP and the construction of LVVS will create an effective and reliable tool for preventing and minimising harmful even...
  • curprev 10:3710:37, 23 October 2020DG Regio talk contribs 11,013 bytes −1,009 Removed claim: summary (P836): The application for the grant of the Environment Fund relates to the construction of the warning and warning system and the creation of a digital flood protection plan for the municipality of Hřěsko. The municipality is threatened by floods and does not have a sufficient instrument and system to prevent flood damage and manage crisis situations. The processing of the VVP and the construction of the LVA will result in the creation of an effecti...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:5110:51, 26 February 2020DG Regio talk contribs 10,750 bytes +1,009 Created claim: summary (P836): The application for the grant of the Environment Fund relates to the construction of the warning and warning system and the creation of a digital flood protection plan for the municipality of Hřěsko. The municipality is threatened by floods and does not have a sufficient instrument and system to prevent flood damage and manage crisis situations. The processing of the VVP and the construction of the LVA will result in the creation of an effective...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020