Revision history of "Processing of a digital flood plan for building a flood warning system for the municipality of Ostroměř" (Q59567)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3108:31, 13 October 2024DG Regio talk contribs 50,716 bytes +1 Changed label, description and/or aliases in pt
  • curprev 08:3108:31, 13 October 2024DG Regio talk contribs 50,715 bytes −4 Set a claim value: summary (P836): O projeto trata da preparação da DPP do município de Ostroměř e da construção do sistema de alerta e alerta do município de Ostroměř. Ao processar o plano de inundação digital, o pré-requisito para as medidas preparatórias pré-inundação será cumprido. Um plano de inundação é um dos conjuntos de atividades que levam a uma possível redução das terríveis consequências das inundações. O alerta precoce à população será assegurado através da criação de um...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 06:1506:15, 24 July 2022DG Regio talk contribs 47,988 bytes +28,278 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3521:35, 2 December 2021DG Regio talk contribs 15,013 bytes +1,314 Created claim: summary (P836): Das Projekt befasst sich mit der Bearbeitung des DPP der Gemeinde Ostroměř und dem Bau des Warn- und Warnsystems der Gemeinde Ostroměř. Die Ausarbeitung eines digitalen Hochwasserplans wird den Maßnahmen vor der Hochwasservorflutung entsprechen. Der Hochwasserplan ist eine der Aktivitäten, die zu einer möglichen Verringerung der schrecklichen Folgen von Überschwemmungen führen. Die Frühwarnung der Bevölkerung wird durch die Einrichtung eines War...
  • curprev 21:3521:35, 2 December 2021DG Regio talk contribs 13,699 bytes +184 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:4022:40, 28 November 2021DG Regio talk contribs 13,515 bytes +1,377 Created claim: summary (P836): Le projet porte sur le traitement du DPP de la municipalité d’Ostroměř et la construction du système d’avertissement et d’avertissement de la municipalité d’Ostroměř. L’élaboration d’un plan d’inondation numérique répondra aux mesures préalables à l’inondation avant l’inondation. Le plan d’inondation est l’un des ensembles d’activités qui permettent de réduire les terribles conséquences des inondations. L’alerte rapide de la population sera assu...
  • curprev 22:4022:40, 28 November 2021DG Regio talk contribs 12,138 bytes +210 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 10:2110:21, 23 October 2020DG Regio talk contribs 12,377 bytes +165 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:2110:21, 23 October 2020DG Regio talk contribs 12,212 bytes −197 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:2110:21, 23 October 2020DG Regio talk contribs 12,409 bytes +1,318 Created claim: summary (P836): The project deals with the preparation of the DPP of the municipality of Ostroměř and the construction of the warning and warning system of the municipality of Ostroměř. By processing the digital flood plan, the prerequisite for pre-flood preparatory measures will be met. A flood plan is one of the sets of activities leading to a possible reduction of the horrific consequences of flooding. Early warning to the population will be ensured by the e...
  • curprev 10:2110:21, 23 October 2020DG Regio talk contribs 11,091 bytes −932 Removed claim: summary (P836): The project deals with the processing of the municipality of Ostrobothnia by the municipality of Ostrobothnia and the building of an alert and warning system by the municipality of Ostrobothnia. The development of a digital flood protection plan will be carried out through the assumption of preparatory measures against floods. The flood management plan is one of the sets of activities leading to possible reduction of the dire consequences in t...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:3810:38, 26 February 2020DG Regio talk contribs 10,744 bytes +932 Created claim: summary (P836): The project deals with the processing of the municipality of Ostrobothnia by the municipality of Ostrobothnia and the building of an alert and warning system by the municipality of Ostrobothnia. The development of a digital flood protection plan will be carried out through the assumption of preparatory measures against floods. The flood management plan is one of the sets of activities leading to possible reduction of the dire consequences in the...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020