Revision history of "Studies of drainage ratios in the Kocába basin – ORP Příbram, Dobříš, Černošice" (Q59202)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:2720:27, 12 October 2024DG Regio talk contribs 49,783 bytes +2 Changed label, description and/or aliases in pt
  • curprev 20:2720:27, 12 October 2024DG Regio talk contribs 49,781 bytes −8 Set a claim value: summary (P836): O objeto do projeto é a bacia do Kocába, incluindo importantes afluentes. É um total de 87 km de vias navegáveis (14 km de vias navegáveis está fora do PMO). Serão efectuados cálculos hidrotécnicos em todos os cursos de água. Além disso, análise navegável e hidromorfológica. Serão analisados 28 pontos críticos de acordo com o estado. Com base nestas análises, serão propostas medidas e estabelecida a sua eficácia. As medidas selecionadas serão integr...

7 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 05:3505:35, 24 July 2022DG Regio talk contribs 48,097 bytes +28,382 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:1721:17, 2 December 2021DG Regio talk contribs 16,001 bytes +1,397 Created claim: summary (P836): Gegenstand des Projekts ist das Becken von Kocába, einschließlich bedeutender Nebenflüsse. Es handelt sich um insgesamt 87 km Wasserläufe (14 km Wasserläufe außerhalb des PMO-Gebiets). Hydrotechnische Berechnungen werden an allen Wasserläufen durchgeführt. Darüber hinaus splavenin und hydromorphologische Analyse. 28 kritische Punkte werden nach POVIS analysiert. Auf der Grundlage dieser Analysen werden Maßnahmen vorgeschlagen und deren Wirksamke...
  • curprev 21:1721:17, 2 December 2021DG Regio talk contribs 14,604 bytes +158 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:3222:32, 28 November 2021DG Regio talk contribs 14,446 bytes +1,406 Created claim: summary (P836): L’objet du projet est le bassin de Kocába, y compris d’importants affluents. Il s’agit d’un total de 87 km de cours d’eau (14 km de cours d’eau à l’extérieur de la zone du PMO). Des calculs hydrotechniques seront effectués sur tous les cours d’eau. De plus, la splavenine et l’analyse hydromorphologique. 28 points critiques selon POVIS seront analysés. Sur la base de ces analyses, des mesures seront proposées et leur efficacité sera déterminée. L...
  • curprev 22:3222:32, 28 November 2021DG Regio talk contribs 13,040 bytes +167 Changed label, description and/or aliases in fr: translated_label

28 October 2020

23 October 2020

  • curprev 11:2411:24, 23 October 2020DG Regio talk contribs 13,318 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2411:24, 23 October 2020DG Regio talk contribs 13,170 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2411:24, 23 October 2020DG Regio talk contribs 13,289 bytes +1,366 Created claim: summary (P836): The object of the project is the basin of Kocába, including important tributaries. It is a total of 87 km of waterways (14 km of waterways is outside PMO). Hydrotechnical calculations will be carried out on all watercourses. In addition, navigable and hydromorphological analysis. 28 critical points will be analysed according to the status. On the basis of these analyses, measures will be proposed and their effectiveness will be established. The...
  • curprev 11:2411:24, 23 October 2020DG Regio talk contribs 11,923 bytes −944 Removed claim: summary (P836): The project to address the project is the Kocaas, including significant tributaries. This is a total of 87 km of watercourses (14 km of water courses outside the PMO). Hydro-technical calculations will be performed on all watercourses. Hereinafter referred to as the sewage and hydromorphic analysis. 28 critical points will be analysed in accordance with the POVIS. Based on these analyses, measures will be proposed and their effectiveness will...

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:0011:00, 26 February 2020DG Regio talk contribs 11,181 bytes +944 Created claim: summary (P836): The project to address the project is the Kocaas, including significant tributaries. This is a total of 87 km of watercourses (14 km of water courses outside the PMO). Hydro-technical calculations will be performed on all watercourses. Hereinafter referred to as the sewage and hydromorphic analysis. 28 critical points will be analysed in accordance with the POVIS. Based on these analyses, measures will be proposed and their effectiveness will be...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020