Revision history of "Merry I (Zašová) – remediation of the resliding area above local roads in the vicinity of buildings No. 75 and 146" (Q59175)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:2720:27, 12 October 2024DG Regio talk contribs 51,916 bytes +4 Changed label, description and/or aliases in pt
  • curprev 20:2720:27, 12 October 2024DG Regio talk contribs 51,912 bytes +237 Set a claim value: summary (P836): O projeto é retomado através da estabilização do deslizamento de terras através de uma estrutura de apoio estabilizadora e de uma drenagem complexa do território. A maior parte dos terrenos em que se situa a medida de estabilização é propriedade do município de Zašová. A subvenção é necessária para o objeto SO 01 – parede de gabiona para o parque n.o 653 k.ú. Feliz em Val.Espanhol. Outros terrenos abrangidos pela totalidade do projeto Parc. n.o 625/...

23 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 05:3205:32, 24 July 2022DG Regio talk contribs 49,468 bytes +29,348 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:1721:17, 2 December 2021DG Regio talk contribs 15,295 bytes +1,441 Created claim: summary (P836): Das Projekt besteht aus der Stabilisierung von Erdrutschen unter Verwendung einer stabilisierenden Stützstruktur und einer komplexen Entwässerung des Gebiets. Der größte Teil des Grundstücks, auf dem sich die Stabilisierungsmaßnahmen befinden, befindet sich im Besitz der Gemeinde Zašová. Für SO 01 Objekt – Gabion Wand für Parc.Nr. 653 k.ú wird eine Subvention beantragt. Fröhlich im Val. Mesoříčí. Andere Parzellen, die unter das gesamte Projekt N...
  • curprev 21:1721:17, 2 December 2021DG Regio talk contribs 13,854 bytes +176 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:3122:31, 28 November 2021DG Regio talk contribs 13,678 bytes +1,452 Created claim: summary (P836): Le projet consiste à stabiliser les glissements de terrain à l’aide d’une structure de soutènement stabilisatrice et d’un drainage complexe du territoire. La plupart des terrains sur lesquels se trouvent les mesures de stabilisation sont la propriété de la municipalité de Zašová. Une subvention est demandée pour l’objet SO 01 — mur de gabion pour parc.no 653 k.ú. Joyeux à Val. Mesoříčí. Autres parcelles concernées par l’ensemble du parc du proje...
  • curprev 22:3122:31, 28 November 2021DG Regio talk contribs 12,226 bytes +195 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 11:2311:23, 23 October 2020DG Regio talk contribs 12,480 bytes +178 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2311:23, 23 October 2020DG Regio talk contribs 12,302 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2311:23, 23 October 2020DG Regio talk contribs 12,450 bytes +1,369 Created claim: summary (P836): The project takes over by stabilising the landslide by means of a stabilising support structure and complex drainage of the territory. Most of the land on which the stabilisation measure is located is owned by the municipality of Zašová. The subsidy is required for object SO 01 – gabione wall for parc. no. 653 k.ú. Happy at Val.Spanish. Other land covered by the whole project parc.No. 625/1, 625/2, 625/3, 625/4, 608/47, 608/48, 658/2, 608/17, 62...
  • curprev 11:2311:23, 23 October 2020DG Regio talk contribs 11,081 bytes −901 Removed claim: summary (P836): The project shall be guided by a stabilisation of landslides through a stabilisation support structure and comprehensive land drainage. The majority of the land on which the stabilisation measure is located are in the estate of Obce Zšová. The subsidy is requested for an SO 01 — gabion wall at CP.No 653. Veselá u Val.Subtotal_. Other land affected by the whole project of plot 625/1, 625/2, 625/3, 625/4, 608/47, 608/48, 652/2, 658/2, 608/17, 66...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:0011:00, 26 February 2020DG Regio talk contribs 10,709 bytes +901 Created claim: summary (P836): The project shall be guided by a stabilisation of landslides through a stabilisation support structure and comprehensive land drainage. The majority of the land on which the stabilisation measure is located are in the estate of Obce Zšová. The subsidy is requested for an SO 01 — gabion wall at CP.No 653. Veselá u Val.Subtotal_. Other land affected by the whole project of plot 625/1, 625/2, 625/3, 625/4, 608/47, 608/48, 652/2, 658/2, 608/17, 666/...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020