Revision history of "Vidlák Pond – study of endangered territory of a special flood" (Q59111)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:1111:11, 12 October 2024DG Regio talk contribs 46,278 bytes +3 Changed label, description and/or aliases in pt
  • curprev 11:1111:11, 12 October 2024DG Regio talk contribs 46,275 bytes +21 Set a claim value: summary (P836): O projeto resolve a determinação da linha de inundação, o curso e a dimensão do ponto culminante de uma inundação especial causada pela ruptura da lagoa de Vidlák, incluindo o progresso temporal do ponto culminante do território. Os resultados são utilizados para determinar os danos potenciais e para o departamento de gestão de crises.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

13 August 2022

  • curprev 15:2515:25, 13 August 2022DG Regio talk contribs 43,062 bytes +24,086 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv, cs, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:1021:10, 2 December 2021DG Regio talk contribs 15,069 bytes +1,164 Created claim: summary (P836): Das Projekt löst die Bestimmung der Hochwasserleitung, den Fortschritt und die Größe des Höhepunkts einer besonderen Flut, die durch den Ausbruch des Teiches Vidlák verursacht wird, einschließlich des Zeitablaufs des Höhepunkts des Gebiets. Die Ergebnisse dienen der Ermittlung von Schadenspotenzialen und der Abteilung Krisenmanagement., translated_summary
  • curprev 21:1021:10, 2 December 2021DG Regio talk contribs 13,905 bytes +142 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:3022:30, 28 November 2021DG Regio talk contribs 13,763 bytes +1,182 Created claim: summary (P836): Le projet résout la détermination de la ligne d’inondation, la progression et la taille du point culminant d’une crue spéciale causée par l’éclatement de l’étang de Vidlák, y compris la procédure temporelle de l’aboutissement de la zone. Le résultat est utilisé pour déterminer les dommages potentiels et pour le service de gestion de crise., translated_summary
  • curprev 22:3022:30, 28 November 2021DG Regio talk contribs 12,581 bytes +127 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 11:1611:16, 23 October 2020DG Regio talk contribs 12,903 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:1611:16, 23 October 2020DG Regio talk contribs 12,779 bytes −131 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:1611:16, 23 October 2020DG Regio talk contribs 12,910 bytes +1,132 Created claim: summary (P836): The project solves the determination of the flood line, the course and size of the culmination of a special flood caused by the rupture of the Vidlák pond, including the time progress of the culmination of the territory. The output is used to determine potential damage and for the crisis management department., translated_summary
  • curprev 11:1611:16, 23 October 2020DG Regio talk contribs 11,778 bytes −691 Removed claim: summary (P836): The project addresses the determination of the flood plain line, the course and the size of a particular flood caused by the bursting of the fishpond Vidulk, including the timing of the peak period of the territory. The output is for the purpose of determining potential damage and for the crisis management department., remove_old_english_translation

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:5910:59, 26 February 2020DG Regio talk contribs 11,179 bytes +691 Created claim: summary (P836): The project addresses the determination of the flood plain line, the course and the size of a particular flood caused by the bursting of the fishpond Vidulk, including the timing of the peak period of the territory. The output is for the purpose of determining potential damage and for the crisis management department., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020