Revision history of "Libchavy – feasibility study of nature close to flooding" (Q58304)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

17 February 2023

13 August 2022

  • curprev 15:2215:22, 13 August 2022DG Regio talk contribs 48,441 bytes +28,012 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv, cs, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:1521:15, 2 December 2021DG Regio talk contribs 15,675 bytes +1,420 Created claim: summary (P836): Das Projekt befasst sich mit dem Hochwasserschutz des bebauten Gebiets der Gemeinde Libchava (Bezirk Ústí nad Orlicí) vor Überschwemmungen auf dem Libchavský potok und seinen seitlichen Nebenflüssen. Die Länge des Abschnitts Libchavský potok beträgt 5,080 km, die Gesamtzahl der Nebenflüsse mit kritischen Punkten beträgt 10. Im Rahmen des Projekts werden diese Arten von Hochwasserschutzmaßnahmen bewertet; 1) Bau von Stauseen an Nebenflüssen von L...
  • curprev 21:1521:15, 2 December 2021DG Regio talk contribs 14,255 bytes +132 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1822:18, 28 November 2021DG Regio talk contribs 14,123 bytes +1,461 Created claim: summary (P836): Le projet porte sur la protection contre les inondations de la zone bâtie de la municipalité de Libchava (district d’Ústí nad Orlicí) contre les crues sur la Libchavský potok et ses affluents latéraux. La longueur de la section Libchavský potok est de 5,080 km, le nombre total de affluents latéraux avec des points critiques est de 10. Le projet évaluera ces types de mesures de lutte contre les inondations; 1) construction de réservoirs de rétent...
  • curprev 22:1822:18, 28 November 2021DG Regio talk contribs 12,662 bytes +162 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 12:0612:06, 23 October 2020DG Regio talk contribs 12,949 bytes +117 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0612:06, 23 October 2020DG Regio talk contribs 12,832 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0612:06, 23 October 2020DG Regio talk contribs 12,969 bytes +1,381 Created claim: summary (P836): The project deals with flood protection of the built-up area of Libchavy (county Ústí nad Orlicí) from flooding in Libchavský Brook and its lateral tributaries. The length of the Libchavský creek section is 5.080 km, the total number of side tributaries with critical points is 10. These types of flood control measures will be assessed in the project; 1) the construction of retention reservoirs on the tributaries of the Libchavský creek, 2) incre...
  • curprev 12:0612:06, 23 October 2020DG Regio talk contribs 11,588 bytes −961 Removed claim: summary (P836): The project addresses the flood protection of the built territory of Obce Libachavy (Ústí nad Orlicí district) over the flood flow to Libachavský potoce and its lateral tributaries. The length of the section of Libachavský potoka is 5.080 km, the total number of side tributaries with the critical points is 10. These types of flood protection measures will be assessed in the project; (1) construction of retention tanks at the tributaries of the...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:2010:20, 26 February 2020DG Regio talk contribs 11,279 bytes +961 Created claim: summary (P836): The project addresses the flood protection of the built territory of Obce Libachavy (Ústí nad Orlicí district) over the flood flow to Libachavský potoce and its lateral tributaries. The length of the section of Libachavský potoka is 5.080 km, the total number of side tributaries with the critical points is 10. These types of flood protection measures will be assessed in the project; (1) construction of retention tanks at the tributaries of the L...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020