Revision history of "PBPO and optimisation of water regime in the cadastral territory of the municipality of Vendolí" (Q58247)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 03:3303:33, 24 July 2022DG Regio talk contribs 48,482 bytes +28,225 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:0321:03, 2 December 2021DG Regio talk contribs 15,580 bytes +1,409 Created claim: summary (P836): Gegenstand des vorliegenden Projekts ist die Ausarbeitung einer Machbarkeitsstudie, in der Maßnahmen zur Bewältigung der Lage auf dem Gebiet vorgeschlagen werden. Das Ergebnis der Machbarkeitsstudie wird konkrete Vorschläge sein, die als Grundlage für die anschließende Umsetzung ausgewählter Hochwasserschutzmaßnahmen, einschließlich naturnaher Hochwassermaßnahmen in einem bestimmten Gebiet, dienen. Zu diesem interessanten Gebiet gehört die Gemei...
  • curprev 21:0321:03, 2 December 2021DG Regio talk contribs 14,171 bytes +137 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1922:19, 28 November 2021DG Regio talk contribs 14,034 bytes +1,421 Created claim: summary (P836): Le présent projet a pour objet la préparation d’une étude de faisabilité qui proposera des mesures pour remédier à la situation sur le territoire. Les résultats de l’étude de faisabilité seront des propositions concrètes, qui serviront de base à la mise en œuvre ultérieure de certaines mesures de protection contre les inondations, y compris des mesures d’inondation fermées dans une zone donnée. Cette zone d’intérêt comprend la municipalité de Ve...
  • curprev 22:1922:19, 28 November 2021DG Regio talk contribs 12,613 bytes +163 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 12:0412:04, 23 October 2020DG Regio talk contribs 12,899 bytes +155 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0412:04, 23 October 2020DG Regio talk contribs 12,744 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0412:04, 23 October 2020DG Regio talk contribs 12,879 bytes +1,340 Created claim: summary (P836): The subject of the submitted project is the preparation of a feasibility study, which will propose measures to address the situation in the territory. The outcome of the feasibility study will be concrete proposals, as a basis for the subsequent implementation of selected flooding measures, including nature close to flooding measures in a specific area. This area of interest includes the municipality of Vendolí (779989) with any minor purpose ov...
  • curprev 12:0412:04, 23 October 2020DG Regio talk contribs 11,539 bytes −934 Removed claim: summary (P836): The subject of this project is the processing of a feasibility study, which will propose measures to address the situation in the country. The outcome of the feasibility study will be concrete proposals, as evidence for the subsequent implementation of selected flood protection measures including nature near flood measures in a specific territory. This area includes the cadastral district of the municipality of Vendorf (779989) with a small am...

22 September 2020

16 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 11:1211:12, 26 February 2020DG Regio talk contribs 11,193 bytes +934 Created claim: summary (P836): The subject of this project is the processing of a feasibility study, which will propose measures to address the situation in the country. The outcome of the feasibility study will be concrete proposals, as evidence for the subsequent implementation of selected flood protection measures including nature near flood measures in a specific territory. This area includes the cadastral district of the municipality of Vendorf (779989) with a small amou...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020