Revision history of "Processing of DPP city and ORP Mělník and building VIS" (Q57941)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:2220:22, 12 October 2024DG Regio talk contribs 50,186 bytes −3 Changed label, description and/or aliases in pt
  • curprev 20:2220:22, 12 October 2024DG Regio talk contribs 50,189 bytes −13 Set a claim value: summary (P836): O projeto trata do processamento de DPP e ORP Mělník e da construção de um sistema de informação de alerta da cidade de Mělník. Ao processar ambos os planos digitais de inundação, o pré-requisito para as medidas preparatórias pré-inundação será cumprido. Um plano de inundação é um dos conjuntos de atividades que levam a uma possível redução das terríveis consequências das inundações. A criação de um sistema de informação de alerta assegurará um aler...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 02:4402:44, 24 July 2022DG Regio talk contribs 47,010 bytes +26,874 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:4120:41, 2 December 2021DG Regio talk contribs 15,689 bytes +1,324 Created claim: summary (P836): Das Projekt befasst sich mit der Bearbeitung der Stadt DPP und ORP Mělník und dem Bau des Informationssystems der Stadt Mělník. Die Vorbereitung der beiden digitalen Hochwasserpläne wird den Anforderungen vor der Hochwasservorflutung vor dem Hochwasser entsprechen. Der Hochwasserplan ist eine der Aktivitäten, die zu einer möglichen Verringerung der schrecklichen Folgen von Überschwemmungen führen. Die Frühwarnung der Bevölkerung wird durch die E...
  • curprev 20:4120:41, 2 December 2021DG Regio talk contribs 14,365 bytes +117 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1722:17, 28 November 2021DG Regio talk contribs 14,248 bytes +1,350 Created claim: summary (P836): Le projet porte sur le traitement du DPP et de l’ORP Mělník et la construction du système d’information de la ville de Mělník. La préparation des deux plans d’inondation numériques répondra aux exigences pré-inondation avant l’inondation avant l’inondation avant l’inondation. Le plan d’inondation est l’un des ensembles d’activités qui permettent de réduire les terribles conséquences des inondations. L’alerte rapide de la population sera assurée...
  • curprev 22:1722:17, 28 November 2021DG Regio talk contribs 12,898 bytes +127 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:2611:26, 23 October 2020DG Regio talk contribs 13,220 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2611:26, 23 October 2020DG Regio talk contribs 13,105 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2611:26, 23 October 2020DG Regio talk contribs 13,244 bytes +1,260 Created claim: summary (P836): The project deals with processing of DPP and ORP Mělník and building a warning information system of the city Mělník. By processing both digital flood plans, the prerequisite for pre-flood preparatory measures will be met. A flood plan is one of the sets of activities leading to a possible reduction of the horrific consequences of flooding. The establishment of an alert information system will ensure early warning to the population., translated_...
  • curprev 11:2611:26, 23 October 2020DG Regio talk contribs 11,984 bytes −863 Removed claim: summary (P836): The project deals with the processing of the city as well as the ORP by Melnik and the building of the alert system of the City of Melnik. The development of the two digital flood plans will be carried out through the assumption of preparatory measures against floods. The flood management plan is one of the sets of activities leading to possible reduction of the dire consequences in the event of floods. The introduction of an alert system will...

24 September 2020

22 September 2020

16 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:4710:47, 26 February 2020DG Regio talk contribs 11,573 bytes +863 Created claim: summary (P836): The project deals with the processing of the city as well as the ORP by Melnik and the building of the alert system of the City of Melnik. The development of the two digital flood plans will be carried out through the assumption of preparatory measures against floods. The flood management plan is one of the sets of activities leading to possible reduction of the dire consequences in the event of floods. The introduction of an alert system will e...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020