Revision history of "Construction of a new building Primary School Roztoky" (Q57786)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:2120:21, 12 October 2024DG Regio talk contribs 51,288 bytes +3 Changed label, description and/or aliases in pt
  • curprev 20:2120:21, 12 October 2024DG Regio talk contribs 51,285 bytes −4 Set a claim value: summary (P836): No âmbito do projeto, será construído um novo edifício da atual Escola Primária de Roztoky, incluindo 4 novas salas de aula profissionais (2 x sala de aula de línguas, sala de aula de TIC e sala de aula de ciências) e outras áreas conexas, a conectividade interna da escola será assegurada e os espaços exteriores da escola serão alterados. A execução do projeto cumprirá, por conseguinte, o objetivo específico 2.4. — Melhorar a qualidade e a disponibi...

23 March 2024

15 January 2024

19 June 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 02:2602:26, 24 July 2022DG Regio talk contribs 47,591 bytes +28,003 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 15,021 bytes +1,418 Created claim: summary (P836): Innerhalb des Projekts wird ein neues Gebäude des ersten Grades der bestehenden Grundschule Roztoky gebaut werden, darunter 4 neue professionelle Klassenräume (2 x Sprachunterricht, IKT-Unterricht und Wissenschaftsunterricht) und andere verwandte Bereiche, die interne Konnektivität der Schule wird sichergestellt und Anpassungen der Außenbereiche der Schule durchgeführt werden. Mit der Durchführung des Projekts wird daher das Einzelziel 2.4 errei...
  • curprev 21:0821:08, 2 December 2021DG Regio talk contribs 13,603 bytes +108 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1422:14, 28 November 2021DG Regio talk contribs 13,495 bytes +1,468 Created claim: summary (P836): Dans le cadre du projet sera construit un nouveau bâtiment du premier degré de l’école primaire existante Roztoky comprenant 4 nouvelles classes professionnelles (2 x classe de langue, salle de classe de TIC et de sciences) et d’autres domaines connexes, la connectivité interne de l’école sera assurée et des ajustements aux espaces extérieurs de l’école seront effectués. La mise en œuvre du projet permettra donc d’atteindre l’objectif spécifique...
  • curprev 22:1422:14, 28 November 2021DG Regio talk contribs 12,027 bytes +127 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 10:5910:59, 23 October 2020DG Regio talk contribs 12,349 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5910:59, 23 October 2020DG Regio talk contribs 12,237 bytes −94 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5910:59, 23 October 2020DG Regio talk contribs 12,331 bytes +1,353 Created claim: summary (P836): As part of the project, a new building will be built of the existing Primary School Roztoky, including 4 new professional classrooms (2 x language classroom, ICT classroom and science classroom) and other related areas, the school’s internal connectivity will be ensured and the school’s outdoor spaces will be modified. The implementation of the project will therefore meet the specific objective 2.4. — Improving the quality and availability of in...
  • curprev 10:5910:59, 23 October 2020DG Regio talk contribs 10,978 bytes −891 Removed claim: summary (P836): The project will build a new first level structure of the existing Primary School, including 4 new vocational classrooms (2 x language classroom, ICT and science textbooks) and other related areas, the internal connectivity of the school will be assured and the school’s outdoor accommodation will be adapted. The implementation of the project will therefore fulfil the specific objective 2.4. — Enhancing the quality and accessibility of educatio...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 10:4510:45, 26 February 2020DG Regio talk contribs 10,083 bytes +891 Created claim: summary (P836): The project will build a new first level structure of the existing Primary School, including 4 new vocational classrooms (2 x language classroom, ICT and science textbooks) and other related areas, the internal connectivity of the school will be assured and the school’s outdoor accommodation will be adapted. The implementation of the project will therefore fulfil the specific objective 2.4. — Enhancing the quality and accessibility of education...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020