Revision history of "Road I/27 Pilsen, Třemošenský Pond – Orlík" (Q57739)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:2120:21, 12 October 2024DG Regio talk contribs 46,174 bytes +1 Changed label, description and/or aliases in pt
  • curprev 20:2120:21, 12 October 2024DG Regio talk contribs 46,173 bytes −9 Set a claim value: summary (P836): O objetivo do projeto é a capacidade da estrada I/27 para um arranjo de quatro passagens da rota principal 1.644 km, principalmente na categoria S 20,75/80. A execução do projeto conduzirá à capacidade da estrada I/27 de duas vias para uma comunicação dividida em quatro vias a partir da capacidade da estrada I/27 no troço entre Pilsen e Třemošná, reduzindo também o tempo de viagem e o risco de acidentes.

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 02:2002:20, 24 July 2022DG Regio talk contribs 43,980 bytes +24,948 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 14,944 bytes +1,267 Created claim: summary (P836): Gegenstand des Projekts ist die Kapazität der Straße I/27 zu einer vierspurigen Anordnung von 1,644 km, hauptsächlich in der Kategorie S 20.75/80. Die Durchführung des Projekts wird zur Kapazität der zweispurigen Straße I/27 auf einer vierstöckigen Richtungsspaltstraße führen. Die Kapazität der Straße I/27 im Abschnitt zwischen Pilsen und Třemošná wird auch die Fahrzeit verkürzen und die Gefahr von Verkehrsunfällen verringern., translated_summary
  • curprev 21:0521:05, 2 December 2021DG Regio talk contribs 13,677 bytes +111 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1322:13, 28 November 2021DG Regio talk contribs 13,566 bytes +1,266 Created claim: summary (P836): L’objet du projet est la capacité de la route I/27 à un aménagement à quatre voies de 1,644 km, principalement dans la catégorie S 20.75/80. La mise en œuvre du projet se traduira par la capacité de la route à deux voies I/27 sur une route divisée directionnelle à quatre voies La capacité de la route I/27 dans le tronçon entre Pilsen et Třemošná réduira également le temps de conduite et le risque d’accidents de la route., translated_summary
  • curprev 22:1322:13, 28 November 2021DG Regio talk contribs 12,300 bytes +110 Changed label, description and/or aliases in fr: translated_label

28 October 2020

23 October 2020

  • curprev 10:5610:56, 23 October 2020DG Regio talk contribs 12,635 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5610:56, 23 October 2020DG Regio talk contribs 12,528 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5610:56, 23 October 2020DG Regio talk contribs 12,630 bytes +1,231 Created claim: summary (P836): The object of the project is the capacity of road I/27 to a four-run arrangement of the main route 1.644 km mainly in category S 20,75/80. The implementation of the project will lead to capacity of the two-run road I/27 to a four-run directionally divided communication from the capacity of the I/27 road in the section between Pilsen and Třemošná will also reduce the journey time and the risk of accidents., translated_summary
  • curprev 10:5610:56, 23 October 2020DG Regio talk contribs 11,399 bytes −788 Removed claim: summary (P836): The purpose of the project is the capacity building of the I/27 road to four lines, in the length of the main route, 1.644 km in category S 20,75/80. The implementation of the project will result in the capacity building of a two-line I/27 road to the 4-bar exchange of communication I/27 in the section between Pilsen and “Třeboňský” will also shorten journey times and reduce the risk of traffic accidents., remove_old_english_translation

22 September 2020

16 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:4310:43, 26 February 2020DG Regio talk contribs 10,905 bytes +788 Created claim: summary (P836): The purpose of the project is the capacity building of the I/27 road to four lines, in the length of the main route, 1.644 km in category S 20,75/80. The implementation of the project will result in the capacity building of a two-line I/27 road to the 4-bar exchange of communication I/27 in the section between Pilsen and “Třeboňský” will also shorten journey times and reduce the risk of traffic accidents., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020