Revision history of "Road I/22 Strakonice" (Q57697)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:2008:20, 13 October 2024DG Regio talk contribs 50,586 bytes −3 Set a claim value: summary (P836): O objetivo do projeto é a construção da relocalização da estrada I/22 na categoria MS2 9.5/50 no comprimento total da rota principal 1.540 km, que será concluída pelo chamado semiarco de transporte do Norte da cidade de Strakonice. A execução do projeto conduzirá à transferência do tráfego de trânsito para fora da construção da cidade, reduzindo assim os encargos da população devido ao ruído e às exalações. Também reduzirá o tempo de viagem e aument...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 02:1302:13, 24 July 2022DG Regio talk contribs 47,919 bytes +27,408 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:5720:57, 2 December 2021DG Regio talk contribs 15,915 bytes +1,436 Created claim: summary (P836): Gegenstand des Projekts ist der Bau einer Neuposition der Straße I/22 in der Kategorie MS2 9.5/50 für die Gesamtlänge der Hauptstrecke von 1,540 km, die den sogenannten Nordverkehrshalbwinkel der Stadt Strakonice vervollständigen wird. Die Durchführung des Projekts wird dazu führen, dass der Transitverkehr außerhalb der Stadt verlagert wird und dadurch die Belastung der Bevölkerung durch Lärm und Ausatmen verringert wird. Die Lenkzeiten werden e...
  • curprev 20:5720:57, 2 December 2021DG Regio talk contribs 14,479 bytes +82 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1322:13, 28 November 2021DG Regio talk contribs 14,397 bytes +1,448 Created claim: summary (P836): L’objet du projet est la construction d’un repositionnement de la route I/22 dans la catégorie MS2 9,5/50 pour la longueur totale de la route principale de 1,540 km, qui complétera la demi-angle de transport nord de la ville de Strakonice. La mise en œuvre du projet entraînera le transfert du trafic de transit en dehors des locaux de la ville et réduira ainsi la charge qui pèse sur la population par le bruit et les exhalations. Les temps de cond...
  • curprev 22:1322:13, 28 November 2021DG Regio talk contribs 12,949 bytes +80 Changed label, description and/or aliases in fr: translated_label

28 October 2020

23 October 2020

  • curprev 10:4010:40, 23 October 2020DG Regio talk contribs 13,314 bytes +79 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:4010:40, 23 October 2020DG Regio talk contribs 13,235 bytes −74 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:4010:40, 23 October 2020DG Regio talk contribs 13,309 bytes +1,373 Created claim: summary (P836): The object of the project is the construction of the relocation of road I/22 in category MS2 9.5/50 in the total length of the main route 1.540 km, which will be completed by the so-called Northern transport half arc of the town of Strakonice. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce tra...
  • curprev 10:4010:40, 23 October 2020DG Regio talk contribs 11,936 bytes −926 Removed claim: summary (P836): The purpose of the project is the construction of the I/22 road in the category MS2 9,5/50, in category MS, in the total length of the main route of 1.540 km, which is being used to assemble the so called North Road for the City of Strakonice. The implementation of the project will lead to the payment of transit traffic away from the building of the city, thus reducing the burden of the population by noise and exile. It will also shorten journ...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:4210:42, 26 February 2020DG Regio talk contribs 11,586 bytes +926 Created claim: summary (P836): The purpose of the project is the construction of the I/22 road in the category MS2 9,5/50, in category MS, in the total length of the main route of 1.540 km, which is being used to assemble the so called North Road for the City of Strakonice. The implementation of the project will lead to the payment of transit traffic away from the building of the city, thus reducing the burden of the population by noise and exile. It will also shorten journey...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020