Revision history of "Road I/34 Božejov – Ondřejov – Pelhřimov" (Q57679)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:0211:02, 12 October 2024DG Regio talk contribs 51,253 bytes 0 Changed label, description and/or aliases in pt
  • curprev 11:0211:02, 12 October 2024DG Regio talk contribs 51,253 bytes −5 Set a claim value: summary (P836): O objetivo do projeto é a construção da relocalização da estrada I/34 na categoria S11,5/70 no comprimento total da rota principal 5,397 km. A estrada I/34 existente atravessa as aldeias de Ústrašín, Ondřejov e Myslotín neste troço. A construção é uma deslocalização que é guiada pelo bypass destas aldeias. A execução do projeto conduzirá à eliminação do tráfego de trânsito fora do edifício, reduzindo a carga da população devido ao ruído e às exalaçõ...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 02:1002:10, 24 July 2022DG Regio talk contribs 49,567 bytes +28,546 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:5520:55, 2 December 2021DG Regio talk contribs 16,229 bytes +1,501 Created claim: summary (P836): Gegenstand des Projekts ist der Bau der Verlegung der Straße I/34 in der Kategorie S11.5/70 für die Gesamtlänge der Hauptstrecke 5,397 km. Die bestehende Straße I/34 führt durch die Entwicklung der Dörfer Úměín, Ondřejov und Myslotín auf diesem Abschnitt. Der Bau ist ein Layout, das von der Umgehung dieser Dörfer geleitet wird. Die Durchführung des Projekts wird dazu führen, dass der Transitverkehr außerhalb der Baustelle entfernt und dadurch di...
  • curprev 20:5520:55, 2 December 2021DG Regio talk contribs 14,728 bytes +109 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1222:12, 28 November 2021DG Regio talk contribs 14,619 bytes +1,489 Created claim: summary (P836): L’objet du projet est la construction du déplacement de la route I/34 dans la catégorie S11.5/70 pour la longueur totale de la route principale 5,397 km. La route existante I/34 passe par le développement des villages Úměín, Ondřejov et Myslotín sur ce tronçon. La construction est un tracé guidé par le contournement de ces villages. La mise en œuvre du projet entraînera la suppression du trafic de transit à l’extérieur du chantier et réduira ain...
  • curprev 22:1222:12, 28 November 2021DG Regio talk contribs 13,130 bytes +107 Changed label, description and/or aliases in fr: translated_label

28 October 2020

23 October 2020

  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 13,468 bytes +106 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 13,362 bytes −99 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 13,461 bytes +1,431 Created claim: summary (P836): The object of the project is the construction of the relocation of road I/34 in category S11,5/70 in the total length of the main route 5.397 km. The existing road I/34 passes through the villages of Ústrašín, Ondřejov and Myslotín in this section. The construction is a relocation that is guided by the bypass of these villages. The implementation of the project will lead to the removal of transit traffic outside of the building, reducing the bur...
  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 12,030 bytes −923 Removed claim: summary (P836): The project concerns the construction of the I/34 road in category S11,5/70 in category S, of the overall length of the road route of 5.397 km. The existing I/34 road is going through the building of the municipalities of Ústrašín, Ondstanov and Myslotín. The building under construction is translated by a bypass of these municipalities. Implementation of the project will lead to a reduction in the burden on the population by noise and exile, s...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:4110:41, 26 February 2020DG Regio talk contribs 11,671 bytes +923 Created claim: summary (P836): The project concerns the construction of the I/34 road in category S11,5/70 in category S, of the overall length of the road route of 5.397 km. The existing I/34 road is going through the building of the municipalities of Ústrašín, Ondstanov and Myslotín. The building under construction is translated by a bypass of these municipalities. Implementation of the project will lead to a reduction in the burden on the population by noise and exile, sho...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020