Revision history of "Building of additional network of charging stations ELEKTRO-PROJEKCE s.r.o." (Q57646)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:2008:20, 13 October 2024DG Regio talk contribs 49,841 bytes +4 Changed label, description and/or aliases in pt
  • curprev 08:2008:20, 13 October 2024DG Regio talk contribs 49,837 bytes +27 Set a claim value: summary (P836): Este projeto destina-se a expandir a infraestrutura de carregamento para veículos elétricos. Serão construídas 18 estações de carregamento de corrente alternada comuns com uma potência máxima de 22 kW em locais selecionados na parte nordeste da República Checa. As estações de carregamento serão construídas em terrenos arrendados. O projeto terá início após a adoção de um ato jurídico com uma presunção de 2.1.2019 e durará até 31.12.2020. A intensida...

7 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

24 July 2022

  • curprev 02:0602:06, 24 July 2022DG Regio talk contribs 47,599 bytes +28,081 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:5420:54, 2 December 2021DG Regio talk contribs 15,870 bytes +1,375 Created claim: summary (P836): Mit diesem Projekt soll die Ladeinfrastruktur für Elektrofahrzeuge ausgebaut werden. An ausgewählten Standorten im Nordosten der Tschechischen Republik werden 18 Standard-AC-Ladestationen mit einer Leistung von bis zu 22 kW errichtet. Ladestationen werden auf gepachteten Grundstücken gebaut. Das Projekt beginnt nach der Ausstellung eines Rechtsakts mit Annahme vom 2.1.2019 und dauert bis zum 31.12.2020. Die erforderliche Beihilfeintensität betr...
  • curprev 20:5420:54, 2 December 2021DG Regio talk contribs 14,495 bytes +131 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1322:13, 28 November 2021DG Regio talk contribs 14,364 bytes +1,426 Created claim: summary (P836): Ce projet vise à étendre l’infrastructure de recharge des véhicules électriques. 18 bornes de recharge en courant alternatif standard d’une puissance maximale de 22 kW seront construites dans des endroits sélectionnés dans la partie nord-est de la République tchèque. Les bornes de recharge seront construites sur des terrains loués. Le projet débutera après la publication d’un acte juridique dans l’hypothèse du 2.1.2019 et durera jusqu’au 31.12....
  • curprev 22:1322:13, 28 November 2021DG Regio talk contribs 12,938 bytes +148 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 10:3810:38, 23 October 2020DG Regio talk contribs 13,243 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3810:38, 23 October 2020DG Regio talk contribs 13,109 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3810:38, 23 October 2020DG Regio talk contribs 13,257 bytes +1,318 Created claim: summary (P836): This project is aimed at expanding charging infrastructure for electric vehicles. 18 common AC charging stations will be built with a maximum output of 22 kW in selected locations in the northeastern part of the Czech Republic. Recharging stations will be built on leased land. The project will start after the adoption of a legal act with a presumption of 2.1.2019 and will last until 31.12.2020. The aid intensity required is 70 %. The total elig...
  • curprev 10:3810:38, 23 October 2020DG Regio talk contribs 11,939 bytes −877 Removed claim: summary (P836): This project aims at expanding the charging infrastructure for electric vehicles. An AC of 18 conventional AC stations will be built, with a maximum output of 22 kW in selected locations in the North-East of the Czech Republic. Recharging points will be built on leased land. The project will start after the adoption of the legal act under the assumption 2.1.2019 and will last until 31.12.2020. The aid intensity requested is 70 %. The total el...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:1110:11, 26 February 2020DG Regio talk contribs 11,116 bytes +877 Created claim: summary (P836): This project aims at expanding the charging infrastructure for electric vehicles. An AC of 18 conventional AC stations will be built, with a maximum output of 22 kW in selected locations in the North-East of the Czech Republic. Recharging points will be built on leased land. The project will start after the adoption of the legal act under the assumption 2.1.2019 and will last until 31.12.2020. The aid intensity requested is 70 %. The total elig...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020