Revision history of "Modernisation of professional classrooms" (Q57263)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 11:0011:00, 12 October 2024DG Regio talk contribs 51,133 bytes +4 Set a claim value: summary (P836): A principal atividade do projeto é o equipamento da sala de aula profissional HW e redes e segundas salas de aula profissional Sistemas de Gestão, conectividade da escola e outros em relação a atividades-chave, sanita sem barreiras com escada em conformidade com o Decreto 398/2009Sb. A atividade secundária é PD, estudos de viabilidade, TDI, ZD para a publicidade estabelecida. A equipa de execução é competente (ver capítulo 7 do estudo), os riscos sã...

12 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 01:1001:10, 24 July 2022DG Regio talk contribs 48,457 bytes +27,954 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:3120:31, 2 December 2021DG Regio talk contribs 15,975 bytes +1,395 Created claim: summary (P836): Die Haupttätigkeit des Projekts ist die Ausstattung des spezialisierten Klassenzimmers HW und Netze und der zweite spezialisierte Klassenraum für Kontrollsysteme, Schulanbindung und andere in Bezug auf Schlüsselaktivitäten, barrierefreie Toilette mit Treppen gemäß dem Dekret 398/2009Sb. Sekundäre Aktivität ist PD, Machbarkeitsstudie, TDI, ZD to VS, Publicity etabliert. Das Durchführungsteam ist kompetent, siehe Kapitel 7 der Studie, die Risiken...
  • curprev 20:3120:31, 2 December 2021DG Regio talk contribs 14,580 bytes +103 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1122:11, 28 November 2021DG Regio talk contribs 14,477 bytes +1,430 Created claim: summary (P836): L’activité principale du projet est l’équipement de la salle de classe spécialisée HW et réseaux et la deuxième classe spécialisée des systèmes de contrôle, la connectivité scolaire et autres en relation avec les activités clés, toilettes sans obstacles avec escaliers conformément au décret 398/2009Sb. L’activité secondaire est PD, étude de faisabilité, TDI, ZD à VS, publicité établie. L’équipe de mise en œuvre est compétente voir chapitre 7 de...
  • curprev 22:1122:11, 28 November 2021DG Regio talk contribs 13,047 bytes +110 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 09:4409:44, 23 October 2020DG Regio talk contribs 13,390 bytes +101 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:4409:44, 23 October 2020DG Regio talk contribs 13,289 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:4409:44, 23 October 2020DG Regio talk contribs 13,384 bytes +1,354 Created claim: summary (P836): The main activity of the project is the equipment of the vocational classroom HW and networks and second vocational classrooms Management Systems, connectivity of the school and others in relation to key activities, barrier-free toilet with staircase in accordance with Decree 398/2009Sb. Secondary activity is PD, feasibility studies, TDI, ZD to the publicity established. The implementation team is competent see Chapter 7 of the study, risks are...
  • curprev 09:4409:44, 23 October 2020DG Regio talk contribs 12,030 bytes −904 Removed claim: summary (P836): The main activity of the project is the equipping of HW vocational classrooms and a second specialised classroom in managing systems, connectivity of schools and others in relation to key activities, barrier-free toilets with stairways in accordance with Decree 398/2009Sb. Ancillary activity is PD, feasibility study, TDI, ZD to the PR, publicity provided. The implementation team is competent, see chapter 7 of the study, risks are eliminated,...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 10:0210:02, 26 February 2020DG Regio talk contribs 11,147 bytes +904 Created claim: summary (P836): The main activity of the project is the equipping of HW vocational classrooms and a second specialised classroom in managing systems, connectivity of schools and others in relation to key activities, barrier-free toilets with stairways in accordance with Decree 398/2009Sb. Ancillary activity is PD, feasibility study, TDI, ZD to the PR, publicity provided. The implementation team is competent, see chapter 7 of the study, risks are eliminated, ta...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020