Revision history of "Elementary School Lípa – Handicap connections and specialised science, languages, computers and technical teaching" (Q56959)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 10:5810:58, 12 October 2024DG Regio talk contribs 50,798 bytes −3 Changed label, description and/or aliases in pt
  • curprev 10:5810:58, 12 October 2024DG Regio talk contribs 50,801 bytes −22 Set a claim value: summary (P836): O objetivo do projeto é melhorar a qualidade da educação na escola primária do município de Lípa, através da realização de um novo edifício que ligue os edifícios existentes do complexo da escola primária. O layout e o preenchimento das aberturas na parte do edifício existente serão modificados. O projeto também inclui a aquisição de equipamentos de sala de aula, que se ligam a competências-chave e implementação de acesso sem barreiras via elevador.

7 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 00:2900:29, 24 July 2022DG Regio talk contribs 46,605 bytes +27,219 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:2420:24, 2 December 2021DG Regio talk contribs 14,923 bytes +1,297 Created claim: summary (P836): Gegenstand des Projekts ist die Verbesserung der Qualität der Bildung in der Grundschule in der Gemeinde Lípa durch die Errichtung eines neuen Gebäudes, das den bestehenden Bau der Grundschule verbindet. Das Layout und das Befüllen der Öffnungen in einem Teil des bestehenden Gebäudes werden geändert. Das Projekt umfasst auch den Erwerb von Unterrichtsgeräten im Zusammenhang mit Schlüsselkompetenzen und die Einführung eines barrierefreien Zugangs...
  • curprev 20:2420:24, 2 December 2021DG Regio talk contribs 13,626 bytes +204 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:0522:05, 28 November 2021DG Regio talk contribs 13,422 bytes +1,335 Created claim: summary (P836): Le projet a pour objet d’améliorer la qualité de l’enseignement dans l’école primaire de la municipalité de Lípa, grâce à la mise en place d’un nouveau bâtiment reliant le bâtiment existant des locaux de l’école primaire. La disposition et le remplissage des ouvertures d’une partie du bâtiment existant seront modifiés. Le projet comprend également l’acquisition d’équipements de classe liés aux compétences clés et la mise en œuvre d’un accès sans...
  • curprev 22:0522:05, 28 November 2021DG Regio talk contribs 12,087 bytes +209 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 11:0311:03, 23 October 2020DG Regio talk contribs 12,327 bytes +177 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:0311:03, 23 October 2020DG Regio talk contribs 12,150 bytes −172 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:0311:03, 23 October 2020DG Regio talk contribs 12,322 bytes +1,285 Created claim: summary (P836): The object of the project is to improve the quality of education in the elementary school in the municipality of Lípa, through the realisation of a new building connecting the existing buildings of the primary school complex. The layout and filling of openings in the part of the existing building will be modified. The project also includes the acquisition of classroom equipment, which binds to key competences and implementation of barrier-free a...
  • curprev 11:0311:03, 23 October 2020DG Regio talk contribs 11,037 bytes −826 Removed claim: summary (P836): The aim of the project is to improve the quality of education at a primary school in the municipality of Lípa, by implementing the new building structure for the building’s existing building. The layout and filling of the holes in the part of the existing building will be adjusted. The project also includes the acquisition of classroom equipment, which attaches to the key competences and implementation of the barrier free of access through a l...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 10:2410:24, 26 February 2020DG Regio talk contribs 10,076 bytes +826 Created claim: summary (P836): The aim of the project is to improve the quality of education at a primary school in the municipality of Lípa, by implementing the new building structure for the building’s existing building. The layout and filling of the holes in the part of the existing building will be adjusted. The project also includes the acquisition of classroom equipment, which attaches to the key competences and implementation of the barrier free of access through a lif...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020