Revision history of "The new education!" (Q56754)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 10:5810:58, 12 October 2024DG Regio talk contribs 49,704 bytes −2 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução de duas salas de aula, incluindo a aquisição de novos equipamentos, solução de acesso sem barreiras a salas de aula recém-renovadas, casa de banho sem barreiras, solução de conectividade e restauração ecológica nas proximidades do edifício da escola. A execução do projeto é necessária devido a um melhor funcionamento das salas de aula e a uma forma de ensino mais moderna, que resultará numa maior satisfação dos...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

23 July 2022

  • curprev 23:5923:59, 23 July 2022DG Regio talk contribs 46,010 bytes +26,899 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:1820:18, 2 December 2021DG Regio talk contribs 14,779 bytes +1,364 Created claim: summary (P836): Ziel des Projekts ist der Wiederaufbau zweier Klassenräume, darunter der Erwerb neuer Geräte, barrierefreier Zugang zu neu renovierten Klassenräumen, barrierefreie Toiletten, Konnektivitätslösungen und die Restaurierung von Grün rund um das Schulgebäude. Die Durchführung des Projekts ist aufgrund einer besseren Funktionalität der Klassenräume und einer moderneren Bildungsweise erforderlich, die zu einer größeren Zufriedenheit der Schüler, Erzieh...
  • curprev 20:1820:18, 2 December 2021DG Regio talk contribs 13,415 bytes +76 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:0522:05, 28 November 2021DG Regio talk contribs 13,339 bytes +1,440 Created claim: summary (P836): L’objectif du projet est la reconstruction de deux salles de classe, y compris l’acquisition de nouveaux équipements, l’accès sans obstacles aux salles de classe récemment rénovées, les toilettes sans obstacles, les solutions de connectivité et la restauration de la verdure autour du bâtiment scolaire. La mise en œuvre du projet est nécessaire en raison d’une meilleure fonctionnalité des salles de classe et d’un mode d’éducation plus moderne, ce...
  • curprev 22:0522:05, 28 November 2021DG Regio talk contribs 11,899 bytes +85 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:5021:50, 22 October 2020DG Regio talk contribs 12,255 bytes +1,337 Created claim: summary (P836): The aim of the project is the reconstruction of two classrooms including the acquisition of new equipment, solution of barrier-free access to newly renovated classrooms, barrier-free toilet, solution of connectivity and green restoration in the vicinity of the school building. Implementation of the project is necessary because of better functioning of classrooms and a more modern way of education, which will result in greater satisfaction of pup...
  • curprev 21:5021:50, 22 October 2020DG Regio talk contribs 10,918 bytes −884 Removed claim: summary (P836): The aim of the project is the reconstruction of two classrooms, including the acquisition of new equipment, the solution of the barrier-free access to a newly constructed classroom, barrier-free toilets, solutions to connectivity and the restoration of green spaces around the school building. The implementation of the project is needed due to a better functionality of the classroom and a more modern way of learning, leading to greater satisfac...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

26 February 2020

  • curprev 10:1410:14, 26 February 2020DG Regio talk contribs 10,015 bytes +884 Created claim: summary (P836): The aim of the project is the reconstruction of two classrooms, including the acquisition of new equipment, the solution of the barrier-free access to a newly constructed classroom, barrier-free toilets, solutions to connectivity and the restoration of green spaces around the school building. The implementation of the project is needed due to a better functionality of the classroom and a more modern way of learning, leading to greater satisfacti...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020