Revision history of "Horses to children" (Q55815)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 10:5310:53, 12 October 2024DG Regio talk contribs 49,071 bytes −13 Set a claim value: summary (P836): DS para o público: Local de realização: Kulnám 582, Statenice (certificado de atribuição n.o na secção Documentos + Explicação do Anexo)Número total de lugares: 8.Calendário total do projecto:1. Fase: 01.01.2020-30.6.2020 (6.o mês) construção de um grupo de crianças2.a fase: 01.07.2020-31.12.2020 (meses) da fase operacional I.3: 01.01.2021-30.06.2021 (meses) da fase II de funcionamento. Fase 2: 01.07.2021-31.12.2021 (6 horas) fase de exploração III....

23 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 21:5621:56, 23 July 2022DG Regio talk contribs 45,902 bytes +26,629 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:3520:35, 2 December 2021DG Regio talk contribs 15,110 bytes +1,290 Created claim: summary (P836): DS für die Öffentlichkeit: Ort der realen Realisierung: An Kulnám 582, Statenice (Dokument + Anhang Erläuterungen)Gesamtanzahl der Sitze: 8.Gesamtplan des Projekts: 1. Phase: 01.01.2020-30.6.2020 (6. Monate) Aufbau einer Kindergruppe2. Phase: 01.07.2020-31.12.2020 (6 Monate) Betriebsphase I.3. Phase: 01.01.2021-30.06.2021 (6 Monate) Betriebsphase II. Stufe 2: 01.07.2021-31.12.2021 (6. m.) Betriebsphase III. Stufe 2: 01.01.2022-30.06.2022 (6. m)...
  • curprev 20:3520:35, 2 December 2021DG Regio talk contribs 13,820 bytes +77 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:5921:59, 28 November 2021DG Regio talk contribs 13,743 bytes +1,341 Created claim: summary (P836): DS pour le public: Lieu de réalisation réelle: À Kulnám 582, Statenice (document + explications de l’annexe) Nombre total de sièges: 8. Calendrier total du projet: 1ère phase: 01.01.2020-30.6.2020 (6ème mois) construction d’un groupe d’enfants2ème phase: 01.07.2020-31.12.2020 (6 mois) phase opérationnelle I.3. phase: 01.01.2021-30.06.2021 (6 mois) Phase d’exploitation II. Phase 2: 01.07.2021-31.12.2021 (6. m.) Phase d’exploitation III. Phase 2:...
  • curprev 21:5921:59, 28 November 2021DG Regio talk contribs 12,402 bytes +79 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:3221:32, 22 October 2020DG Regio talk contribs 12,773 bytes +1,342 Created claim: summary (P836): DS for the public: Place of real realisation: Kulnám 582, Statenice (certificate of allotment no. in the Documents section + Annex Explanation)Total number of seats: 8.Total timetable of the project:1. phase: 01.01.2020-30.6.2020 (6th months) construction of a children’s group2nd phase: 01.07.2020-31.12.2020 (months) of phase I.3 operation phase: 01.01.2021-30.06.2021 (months) of operation phase II. Phase 2: 01.07.2021-31.12.2021 (6. m.) operati...
  • curprev 21:3221:32, 22 October 2020DG Regio talk contribs 11,431 bytes −881 Removed claim: summary (P836): DS for the public: Instead of real realisation: To Kulus 582, Stenice (document on allocation No in the section of documents + Annex Explanation) Total number of places: 8.Overall project schedule: phase 1: 01.01.2020-30.6.2020 (6 months), construction of the 2nd phase of the nd phase: 01.07.2020-31.12.2020 (6s) Phase I.3. phase: 01.01.2021-30.06.2021 (6 months) operational phase II. Phase 2: 01.07.2021-31.12.2021 (6 m) operational phase III....

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 10:2310:23, 26 February 2020DG Regio talk contribs 11,023 bytes +881 Created claim: summary (P836): DS for the public: Instead of real realisation: To Kulus 582, Stenice (document on allocation No in the section of documents + Annex Explanation) Total number of places: 8.Overall project schedule: phase 1: 01.01.2020-30.6.2020 (6 months), construction of the 2nd phase of the nd phase: 01.07.2020-31.12.2020 (6s) Phase I.3. phase: 01.01.2021-30.06.2021 (6 months) operational phase II. Phase 2: 01.07.2021-31.12.2021 (6 m) operational phase III. Ph...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020