Revision history of "Children’s Group of the City of Red Kostelec" (Q55722)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 10:5310:53, 12 October 2024DG Regio talk contribs 51,064 bytes +10 Changed label, description and/or aliases in pt
  • curprev 10:5310:53, 12 October 2024DG Regio talk contribs 51,054 bytes +5 Set a claim value: summary (P836): DS.Dados para grupos de crianças (DS) recém-construídos, cujo apoio solicitamos:- Endereço do local de tráfego DS: Komenského 26, Č. Kostelec (espaços adaptados que servem originalmente como residência)- Capacidade DS: 12 crianças – O projeto será executado de 1.11.2019 a 30.6.2022, dos quais a duração da fase de projeto para a construção da DS terá lugar de 1.11.2019 a 31.12.2019. De 1.1.2020 a 30.6.2022, a fase de projeto do funcionamento da estru...

22 March 2024

15 January 2024

11 June 2023

17 February 2023

23 July 2022

  • curprev 21:4421:44, 23 July 2022DG Regio talk contribs 47,865 bytes +27,858 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:3120:31, 2 December 2021DG Regio talk contribs 15,423 bytes +1,415 Created claim: summary (P836): Neu gebaute DS.Data an Kindergruppe (DS), deren Unterstützung angefordert wird:- Adresse der DS-Website: Komenský 26, Nr. Kostelec (gepasste Räumlichkeiten, die ursprünglich als Gehäuse genutzt wurden) – Kapazität von DS: 12 Kinder – Das Projekt wird vom 1.11.2019 bis zum 30.6.2022 umgesetzt, wovon die Dauer der Projektphase für den Bau (Einrichtung) des DS vom 1.11.2019 bis zum 31.12.2019 stattfindet. Vom 1.1.2020 bis zum 30.6.2022 läuft die Pr...
  • curprev 20:3120:31, 2 December 2021DG Regio talk contribs 14,008 bytes +88 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:5321:53, 28 November 2021DG Regio talk contribs 13,920 bytes +1,399 Created claim: summary (P836): DS.Données nouvellement construites au groupe d’enfants (DS), dont le soutien est demandé:- Adresse du site DS: Komenský 26, No Kostelec (locaux adaptés utilisés à l’origine comme logement) — Capacité de DS: 12 enfants — Le projet sera mis en œuvre du 1.11.2019 au 30.6.2022, dont la durée de la phase de projet pour la construction (établissement) de la DS aura lieu du 1.11.2019 au 31.12.2019. Du 1.1.2020 au 30.6.2022, la phase de projet des stru...
  • curprev 21:5321:53, 28 November 2021DG Regio talk contribs 12,521 bytes +93 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 10:1010:10, 23 October 2020DG Regio talk contribs 12,877 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:1010:10, 23 October 2020DG Regio talk contribs 12,772 bytes −94 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:1010:10, 23 October 2020DG Regio talk contribs 12,866 bytes +1,384 Created claim: summary (P836): Newly built DS.Data for children’s group (DS), whose support we ask for:- Address of the DS traffic location: Komenského 26, Č. Kostelec (adapted spaces serving originally as residential)- DS capacity: 12 children – The project will be implemented from 1.11.2019 to 30.6.2022, of which the length of the project phase for the construction of the DS will take place from 1.11.2019 to 31.12.2019. From 1.1.2020 to 30.6.2022, the project phase of the o...
  • curprev 10:1010:10, 23 October 2020DG Regio talk contribs 11,482 bytes −917 Removed claim: summary (P836): Newly constructed DS.Data to the Child Group (DS), for which support is requested: — Address of the DS: Koumenská 26, No. Kostelec (adapted areas originally used as housing) — Capacity of the DS: 12 The project will be implemented from 1.11.2019 to 30.6.2022, of which the design phase for the construction (creation) of the DS will take place between 1.11.2019 and 31.12.2019. From 1.1.2020 to 30.6.2022, the project phase of the operation DS-For...

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 10:0710:07, 26 February 2020DG Regio talk contribs 11,117 bytes +917 Created claim: summary (P836): Newly constructed DS.Data to the Child Group (DS), for which support is requested: — Address of the DS: Koumenská 26, No. Kostelec (adapted areas originally used as housing) — Capacity of the DS: 12 The project will be implemented from 1.11.2019 to 30.6.2022, of which the design phase for the construction (creation) of the DS will take place between 1.11.2019 and 31.12.2019. From 1.1.2020 to 30.6.2022, the project phase of the operation DS-Form...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020