Revision history of "Children’s Group – Comdata" (Q55550)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 10:5310:53, 12 October 2024DG Regio talk contribs 48,615 bytes +5 Changed label, description and/or aliases in pt
  • curprev 10:5310:53, 12 October 2024DG Regio talk contribs 48,610 bytes +26 Set a claim value: summary (P836): O projeto irá gerir um grupo de crianças com capacidade para 10 crianças. O local de execução do projeto será Soukenné náměstí 115/6, Liberec 460 01 e o horário de funcionamento previsto será das 8h00 às 16h00. A fase de construção terá início a partir de 1. 7. 2019 e decorrerá até 30.6. 2020, 12 meses. Depois, será a partir de 1. 7. 2020 Iniciou-se a fase operacional, que terá a duração de 4 semestres, ou seja, até 30.6. 2022. O mecanismo será conc...

7 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

23 July 2022

  • curprev 21:2021:20, 23 July 2022DG Regio talk contribs 46,892 bytes +26,985 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:0920:09, 2 December 2021DG Regio talk contribs 17,204 bytes +1,401 Created claim: summary (P836): Im Rahmen des Projekts wird eine Gruppe von Firmenkindern mit einer Kapazität von 10 Kindern betrieben. Veranstaltungsort für die Realisierung des Projekts ist Soukenné náměstí 115/6, Liberec 460 01 und die voraussichtlichen Öffnungszeiten von 8:00 bis 16:00 Uhr. Die Bauphase beginnt ab 1. 7. 2019 und läuft bis 30.6. 2020, d. h. 12 Monate. Es wird dann von 1 sein. 7. 2020 die operative Phase, die für vier Semester, d. h. bis zum 30.6. 2022. Die...
  • curprev 20:0920:09, 2 December 2021DG Regio talk contribs 15,803 bytes +83 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:5221:52, 28 November 2021DG Regio talk contribs 15,720 bytes +1,450 Created claim: summary (P836): Dans le cadre du projet, un groupe d’enfants d’une capacité de 10 enfants sera mis en place. Le lieu de réalisation du projet sera Soukenné náměstí 115/6, Liberec 460 01 et les heures d’ouverture prévues seront de 8h00 à 16h00. La phase de construction débutera à partir de 1. 7. 2019 et se déroulera jusqu’au 30.6. 2020, c’est-à-dire 12 mois. Ce sera alors à partir de 1. 7. 2020 la phase opérationnelle, qui durera 4 semestres, c’est-à-dire jusqu’...
  • curprev 21:5221:52, 28 November 2021DG Regio talk contribs 14,270 bytes +89 Changed label, description and/or aliases in fr: translated_label

28 October 2020

23 October 2020

  • curprev 09:5909:59, 23 October 2020DG Regio talk contribs 14,626 bytes +89 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5909:59, 23 October 2020DG Regio talk contribs 14,537 bytes −89 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5909:59, 23 October 2020DG Regio talk contribs 14,626 bytes +1,388 Created claim: summary (P836): The project will run a children’s group with a capacity of 10 children. The place of implementation of the project will be Soukenné náměstí 115/6, Liberec 460 01 and the expected opening hours will be from 8:00 to 16:00 a.m. The construction phase will begin from 1. 7. 2019 and will run until 30.6. 2020, 12 months. Then it’s going to be from 1. 7. 2020 The operational phase started, which will last for 4 semesters, i.e. until 30.6. 2022. The fac...
  • curprev 09:5909:59, 23 October 2020DG Regio talk contribs 13,238 bytes −868 Removed claim: summary (P836): The project will operate a children group with a capacity of 10 children. The project’s execution venue will be 115/6, Liberec 460 01 and the expected opening hours will be from 8: 00 to 16: 00. The construction phase will start from 1. 7. 2019 and up to 30.6. 2020, that is to say 12 months. It will then be 1. 7. The operational phase is 2020 and will last for 4 semester, up to 30.6. 2022. The facility will be designed for business employees a...

24 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 10:0810:08, 26 February 2020DG Regio talk contribs 12,026 bytes +868 Created claim: summary (P836): The project will operate a children group with a capacity of 10 children. The project’s execution venue will be 115/6, Liberec 460 01 and the expected opening hours will be from 8: 00 to 16: 00. The construction phase will start from 1. 7. 2019 and up to 30.6. 2020, that is to say 12 months. It will then be 1. 7. The operational phase is 2020 and will last for 4 semester, up to 30.6. 2022. The facility will be designed for business employees and...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020