Revision history of "DS Sunshine" (Q55511)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:1408:14, 13 October 2024DG Regio talk contribs 46,838 bytes −5 Changed label, description and/or aliases in pt
  • curprev 08:1408:14, 13 October 2024DG Regio talk contribs 46,843 bytes +17 Set a claim value: summary (P836): — o endereço exato do local de funcionamento do grupo de crianças — Pod Fortress 394, 250 70 Odolena Voda-capacidade do grupo de crianças, ou seja, o número de lugares — calendário total do projeto de 6 — a partir de 1. 7. 2019 a 30.6.2022, dos quais a duração prevista da fase de projeto para a construção de um grupo de crianças (em pormenor 1.7. 2019 a 31.12. 2019),-forma das estruturas de acolhimento de crianças em termos de utilizadores: para o p...

7 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 21:1421:14, 23 July 2022DG Regio talk contribs 43,644 bytes +24,834 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:5619:56, 2 December 2021DG Regio talk contribs 14,768 bytes +1,239 Created claim: summary (P836): — genaue Adresse des Betriebsorts der Kindergruppe – Pod Festung 394, 250 70 Odolena Voda-Kapazität der Kindergruppe, d. h. Anzahl der Sitze – 6-Gesamtplan des Projekts – ab 1. 7. 2019 bis 30.6.2022, davon die voraussichtliche Dauer der Projektphase für den Aufbau einer Kindergruppe (Details 1.7. 2019 bis 31.12. 2019),- Form von Kinderbetreuungseinrichtungen aus Sicht der Nutzer: für die Öffentlichkeit, translated_summary
  • curprev 19:5619:56, 2 December 2021DG Regio talk contribs 13,529 bytes +74 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:5321:53, 28 November 2021DG Regio talk contribs 13,455 bytes +1,287 Created claim: summary (P836): — adresse exacte du lieu de fonctionnement du groupe d’enfants — Forteresse Pod 394, 250 70 Odolena Voda-capacité du groupe d’enfants, c’est-à-dire nombre de sièges — 6-horaire total du projet — à partir de 1. 7. De 2019 au 30.6.2022, dont la durée prévue de la phase du projet de construction d’un groupe d’enfants (en détail 1.7. 2019 au 31.12. 2019),-la forme de structures de garde d’enfants du point de vue des usagers: pour le public, translat...
  • curprev 21:5321:53, 28 November 2021DG Regio talk contribs 12,168 bytes +80 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 09:5009:50, 23 October 2020DG Regio talk contribs 12,541 bytes +72 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5009:50, 23 October 2020DG Regio talk contribs 12,469 bytes −71 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5009:50, 23 October 2020DG Regio talk contribs 12,540 bytes +1,247 Created claim: summary (P836): — the exact address of the place of operation of the children’s group – Pod Fortress 394, 250 70 Odolena Voda-capacity of children’s group, i.e. number of seats – 6-total project schedule – from 1. 7. 2019 to 30.6.2022, of which the expected length of the project phase for the construction of a children’s group (in detail 1.7. 2019 to 31.12. 2019),-form of childcare facilities in terms of users: for the public, translated_summary
  • curprev 09:5009:50, 23 October 2020DG Regio talk contribs 11,293 bytes −811 Removed claim: summary (P836): The exact address of the child group’s place of operation — PFrom Tvrzam 394, 250 70 Odomena Vodo-capacity of the children group, i.e. number of places — 6-the overall timetable of the project — from 1. 7. 2019 to 30.6.2022, of which the expected duration of the project phase for setting up a child group (in detail 1.7. 2019 to 31.12 2019), the user’s type of childcare facility from the point of view of users: for the public, remove_old_englis...

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:5609:56, 26 February 2020DG Regio talk contribs 10,815 bytes +811 Created claim: summary (P836): The exact address of the child group’s place of operation — PFrom Tvrzam 394, 250 70 Odomena Vodo-capacity of the children group, i.e. number of places — 6-the overall timetable of the project — from 1. 7. 2019 to 30.6.2022, of which the expected duration of the project phase for setting up a child group (in detail 1.7. 2019 to 31.12 2019), the user’s type of childcare facility from the point of view of users: for the public, Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020