Revision history of "IT’S TEDDY II. — Continue" (Q54606)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:1008:10, 13 October 2024DG Regio talk contribs 50,472 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:1008:10, 13 October 2024DG Regio talk contribs 50,472 bytes +32 Set a claim value: summary (P836): A DS baseia-se em estruturas de acolhimento de crianças apoiadas pelo projeto Teddy Říčany II. em Kaštanová 1, 251 01 Říčany (está prevista uma segunda DS no endereço indicado, mas totalmente independente desta). A DS funcionará no mesmo endereço. A capacidade da DS será de 20 crianças. Calendário global do projecto: funcionamento de 1.3.2018 a 29.2.2020Tipo de estabelecimento de prestação de cuidados a crianças em idade pré-escolar: DS de acordo co...

20 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 19:0719:07, 23 July 2022DG Regio talk contribs 47,258 bytes +27,501 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:5119:51, 2 December 2021DG Regio talk contribs 15,301 bytes +1,390 Created claim: summary (P836): Die DS verfolgt eine Kinderbetreuungseinrichtung, die durch das Projekt TEDDY Říčany II in Kaštanová 1, 251 01 Říčany unterstützt wird (der zweite DS ist an der Adresse geplant, aber völlig unabhängig davon). DS wird an derselben Adresse betrieben.Capacita DS wird 20 Kinder sein. Gesamtplan des Projekts: Betrieb vom 1.3.2018 bis zum 29.2.2020Art der Kinderbetreuungseinrichtungen im Vorschulalter: DS gemäß Gesetz Nr. 247/2014 Coll.Formen von Kind...
  • curprev 19:5119:51, 2 December 2021DG Regio talk contribs 13,911 bytes +84 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 13,827 bytes +1,408 Created claim: summary (P836): La DS assure le suivi d’une structure de garde d’enfants soutenue par le projet TEDDY ▲íčany II à Kaštanová 1, 251 01 ″íčany (la deuxième DS est prévue à l’adresse, mais totalement indépendante de cela). DS sera opéré à la même adresse.Capacita DS sera 20 enfants. Calendrier global du projet: opération du 1.3.2018 au 29.2.2020Type de structures de garde d’enfants d’âge préscolaire: DS conformément à la loi no 247/2014 Coll.Formes des structures...
  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 12,419 bytes +82 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 09:0309:03, 23 October 2020DG Regio talk contribs 12,786 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:0309:03, 23 October 2020DG Regio talk contribs 12,698 bytes −84 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 06:3806:38, 23 October 2020DG Regio talk contribs 12,782 bytes +1,339 Created claim: summary (P836): DS builds on childcare facility supported by Teddy Říčany II. project at Kaštanová 1, 251 01 Říčany (a second DS is planned at the given address, but completely independent of this one). DS will be operated at the same address.The DS capacity will be 20 children. Overall timetable of the project: operation from 1.3.2018 to 29.2.2020Type of care facility for pre-school children: DS according to Act No. 247/2014 Coll. Form of childcare facility in...
  • curprev 06:3806:38, 23 October 2020DG Regio talk contribs 11,443 bytes −856 Removed claim: summary (P836): The DS is a continuation of child care facilities supported by the TEDDY Romany II, chestnut 1, 251 01 Říčany (a second DS is planned at this address, but completely independent from this). The DS will be operated on the same address.Capacity of the DS will be 20 children. The overall timetable of the project is as follows: operation from 1.3.2018 to 29.2.2020 Type of early childhood care facility: DS pursuant to Law No 247/2014. for Publicall...

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:5709:57, 26 February 2020DG Regio talk contribs 11,008 bytes +856 Created claim: summary (P836): The DS is a continuation of child care facilities supported by the TEDDY Romany II, chestnut 1, 251 01 Říčany (a second DS is planned at this address, but completely independent from this). The DS will be operated on the same address.Capacity of the DS will be 20 children. The overall timetable of the project is as follows: operation from 1.3.2018 to 29.2.2020 Type of early childhood care facility: DS pursuant to Law No 247/2014. for Publically-...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020