Revision history of "Bertik’s group" (Q54465)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:0720:07, 12 October 2024DG Regio talk contribs 45,757 bytes −3 Changed label, description and/or aliases in pt
  • curprev 20:0720:07, 12 October 2024DG Regio talk contribs 45,760 bytes 0 Set a claim value: summary (P836): A área BI não explora estruturas de acolhimento de crianças há mais de 6 meses.Dados sobre o grupo de crianças, cujo apoio solicitamos: endereço do local de operação: Husova 113, Kolín I, 280 02 Kolíncapacity DS:12 Calendário de realização: de 1.1.2018 a 31.10.2020; a partir da qual está prevista a fase de construção até 31.10.2018Formulário DS: grupo de crianças para o público

23 March 2024

15 January 2024

6 July 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:4618:46, 23 July 2022DG Regio talk contribs 42,568 bytes +23,827 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:4719:47, 2 December 2021DG Regio talk contribs 14,997 bytes +1,178 Created claim: summary (P836): Bereich B Ich betreibe keine Kinderbetreuungseinrichtungen für mehr als 6 Monate.Daten an die Kindergruppe, deren Unterstützung beantragt wird: Standortadresse provozu:Husova 113, Kolín I, 280 02 Kolínkapacita DS:12 Umsetzungszeitplan: vom 1.1.2018 bis zum 31.10.2020; davon ist die Bauphase bis 31.10.2018Forma DS: Kindergruppe für die Öffentlichkeit, translated_summary
  • curprev 19:4719:47, 2 December 2021DG Regio talk contribs 13,819 bytes +75 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 13,744 bytes +1,169 Created claim: summary (P836): Zone B Je n’ai pas de garderies pendant plus de 6 mois.Données au groupe d’enfants, dont le soutien est demandé: adresse provozu:Husova 113, Kolín I, 280 02 Kolínkapacita DS:12 Calendrier de mise en œuvre: du 1.1.2018 au 31.10.2020; dont la phase de construction est prévue jusqu’au 31.10.2018Forma DS: groupe d’enfants pour le public, translated_summary
  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 12,575 bytes +77 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:3821:38, 22 October 2020DG Regio talk contribs 12,947 bytes +1,191 Created claim: summary (P836): Area BI do not operate childcare facilities for more than 6 months.Data on the children’s group, whose support we are asking for: address of the place of operation:Husova 113, Kolín I, 280 02 Kolíncapacity DS:12 Realisation schedule: from 1.1.2018 to 31.10.2020; from which the construction phase is planned to 31.10.2018The DS form: children’s group for the public, translated_summary
  • curprev 21:3821:38, 22 October 2020DG Regio talk contribs 11,756 bytes −708 Removed claim: summary (P836): BN does not operate childcare facilities for more than 6 months.Data to the Children’s Group, for which support is requested: location address: husova 113, Kolín I, 280 02 Kolín Capacity DS: 12 Implementation schedule: from 1.1.2018 to 31.10.2020; this is planned to be built in 31.10.2018Form DS: children’s Group for the Public, remove_old_english_translation

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:5209:52, 26 February 2020DG Regio talk contribs 11,175 bytes +708 Created claim: summary (P836): BN does not operate childcare facilities for more than 6 months.Data to the Children’s Group, for which support is requested: location address: husova 113, Kolín I, 280 02 Kolín Capacity DS: 12 Implementation schedule: from 1.1.2018 to 31.10.2020; this is planned to be built in 31.10.2018Form DS: children’s Group for the Public, Adding English summary

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020