Revision history of "BUILDING A CHILDREN’S GROUP OF DAISIES" (Q54320)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:0720:07, 12 October 2024DG Regio talk contribs 49,331 bytes −2 Changed label, description and/or aliases in pt
  • curprev 20:0720:07, 12 October 2024DG Regio talk contribs 49,333 bytes +5 Set a claim value: summary (P836): A estrutura de acolhimento de crianças funcionará em Náměstí Svobody 53/54, 438 01 Žatec. A capacidade prevista das estruturas de acolhimento de crianças após a construção é de 15 lugares. Pretendemos executar o projeto de 1.3.2017 a 31.8.2019, sendo a fase de projeto para a construção de estruturas de acolhimento de crianças de 1.3.2017 a 31.8.2017, ou seja, 6 meses. Após a construção, a instalação funcionará como um grupo de crianças, em conformid...

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:2518:25, 23 July 2022DG Regio talk contribs 46,658 bytes +26,632 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:3419:34, 2 December 2021DG Regio talk contribs 17,486 bytes +1,355 Created claim: summary (P836): Die Kinderbetreuungseinrichtung wird in Náměstí Svobody 53/54, 438 01 Žatec betrieben. Die geplante Kapazität der Kinderbetreuungseinrichtung nach dem Bau beträgt 15 Plätze. Wir wollen das Projekt vom 1.3.2017 bis zum 31.8.2019 umsetzen, wovon die voraussichtliche Laufzeit der Projektphase für den Bau von Kinderbetreuungseinrichtungen vom 1.3.2017 bis zum 31.8.2017, d. h. 6 Monaten, liegt. Nach dem Bau wird die Einrichtung als Kindergruppe gemäß...
  • curprev 19:3419:34, 2 December 2021DG Regio talk contribs 16,131 bytes +90 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 16,041 bytes +1,337 Created claim: summary (P836): La garderie sera exploitée à Náměstí Svobody 53/54, 438 01 Žatec. La capacité prévue de la garderie après la construction est de 15 places. Nous voulons mettre en œuvre le projet du 1.3.2017 au 31.8.2019, dont la durée prévue de la phase de projet pour la construction de structures de garde d’enfants va du 1.3.2017 au 31.8.2017, soit 6 mois. Après sa construction, l’installation sera exploitée en tant que groupe d’enfants conformément à la loi n...
  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 14,704 bytes +103 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:2721:27, 22 October 2020DG Regio talk contribs 15,071 bytes +1,305 Created claim: summary (P836): The childcare facility will be operated at Náměstí Svobody 53/54, 438 01 Žatec. The planned capacity of childcare facilities after construction is 15 seats. We want to implement the project from 1.3.2017 to 31.8.2019, of which the project phase for the construction of childcare facilities is from 1.3.2017 to 31.8.2017, i.e. 6 months. After construction, the facility will be operated as a children’s group according to Act No.247/2014 Coll. and wi...
  • curprev 21:2721:27, 22 October 2020DG Regio talk contribs 13,766 bytes −915 Removed claim: summary (P836): The childcare facility will be located on the Internet of Freedom of Freedom 53/54, 438 01 Žatec. The planned capacity of the childcare facility after the construction is 15 places. We want to implement the project from 1.3.2017 to 31.8.2019, of which the projected duration of the project phase for the construction of childcare facilities is between 1.3.2017 and 31.8.2017, i.e. 6 months. After the construction, the establishment will be operat...

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:4209:42, 26 February 2020DG Regio talk contribs 12,569 bytes +915 Created claim: summary (P836): The childcare facility will be located on the Internet of Freedom of Freedom 53/54, 438 01 Žatec. The planned capacity of the childcare facility after the construction is 15 places. We want to implement the project from 1.3.2017 to 31.8.2019, of which the projected duration of the project phase for the construction of childcare facilities is between 1.3.2017 and 31.8.2017, i.e. 6 months. After the construction, the establishment will be operated...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020