Revision history of "Children’s group Goblin" (Q54296)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:0908:09, 13 October 2024DG Regio talk contribs 46,433 bytes +4 Changed label, description and/or aliases in pt
  • curprev 08:0908:09, 13 October 2024DG Regio talk contribs 46,429 bytes +9 Set a claim value: summary (P836): O projeto será executado em: Olomoucká 1848/173, 785 01 Šternberk. O grupo de crianças (a seguir designado por «DS»), nos termos da Lei n.o 247/2014 Coll., está previsto para a capacidade de 12 crianças. Calendário do projeto (1.7.2017-30.9.2019), do qual será implementada a fase de projeto para a construção de equipamento (1.7.2017-30.9.2017). O próprio funcionamento da DS será implementado 1.10.2017-30.9.2019. ao público.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:2218:22, 23 July 2022DG Regio talk contribs 43,750 bytes +24,355 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:3719:37, 2 December 2021DG Regio talk contribs 15,364 bytes +1,257 Created claim: summary (P836): Das Projekt wird unter folgender Adresse durchgeführt: Olomoucká 1848/173, 785 01 Šternberk.Kindergruppe (im Folgenden „DS“) gemäß Gesetz Nr. 247/2014 Slg. ist für die Kapazität von 12 Kindern Projektplan (1.7.2017-30.9.2019) geplant, davon die voraussichtliche Dauer der Projektphase für den Bau der Anlage (1.7.2017-30.9.2017).Der eigene Betrieb des DS wird vom 1.10.2017-30.9.2019 durchgeführt. für die Öffentlichkeit., translated_summary
  • curprev 19:3719:37, 2 December 2021DG Regio talk contribs 14,107 bytes +81 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 14,026 bytes +1,288 Created claim: summary (P836): Le projet sera mis en œuvre à l’adresse suivante: Olomoucká 1848/173, 785 01 Šternberk.Le groupe d’enfants (ci-après dénommé «DS») conformément à la loi no 247/2014 Coll. est prévu pour la capacité de 12 enfants Annexe du projet (1.7.2017-30.9.2019), dont la durée estimée de la phase de projet pour la construction de l’installation (1.7.2017-30.9.2017).La propre exploitation de la DS sera mise en œuvre du 1.10.2017-30.9.2019. pour le public., tr...
  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 12,738 bytes +87 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:2121:21, 22 October 2020DG Regio talk contribs 13,095 bytes +1,256 Created claim: summary (P836): The project will be implemented at: Olomoucká 1848/173, 785 01 Šternberk.The children’s group (hereinafter referred to as “DS”) according to Act No. 247/2014 Coll. is planned for the capacity of 12 children Project schedule (1.7.2017-30.9.2019), of which the project phase for the construction of equipment (1.7.2017-30.9.2017) will be implemented.The DS’s own operation will be implemented 1.10.2017-30.9.2019. to the public., translated_summary
  • curprev 21:2121:21, 22 October 2020DG Regio talk contribs 11,839 bytes −822 Removed claim: summary (P836): The project will be carried out at: Olomoucká 1848/173, 785 01 Šternberk.Children’s Group (hereinafter ‘DS’), pursuant to Act No 247/2014, are planned for the capacity of 12 children a schedule of the project (1.7.2017-30.9.2019), of which the expected duration of the construction phase for the construction of the installation (1.7.2017-30.9.2017).The conservation of the DS will be carried out 1.10.2017-30.9.2019.Form DS: for the public., remo...

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:3109:31, 26 February 2020DG Regio talk contribs 11,380 bytes +822 Created claim: summary (P836): The project will be carried out at: Olomoucká 1848/173, 785 01 Šternberk.Children’s Group (hereinafter ‘DS’), pursuant to Act No 247/2014, are planned for the capacity of 12 children a schedule of the project (1.7.2017-30.9.2019), of which the expected duration of the construction phase for the construction of the installation (1.7.2017-30.9.2017).The conservation of the DS will be carried out 1.10.2017-30.9.2019.Form DS: for the public., Adding...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020