Revision history of "Children’s group Pohoda Horoměřice" (Q54282)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:0620:06, 12 October 2024DG Regio talk contribs 49,375 bytes +4 Changed label, description and/or aliases in pt
  • curprev 20:0620:06, 12 October 2024DG Regio talk contribs 49,371 bytes +1 Set a claim value: summary (P836): A estrutura de acolhimento de crianças funcionará em Velvarská 121,Horoměřice, 252 62. A capacidade prevista das estruturas de acolhimento de crianças após a transformação é de 12 lugares. Pretendemos executar o projeto de 1.5.2017 a 30.9.2019, prevendo-se que a fase de projeto transforme a estrutura de acolhimento de crianças de 1.5.2017 a 30.9.2017, ou seja, 5 meses. Após a transformação, a instalação funcionará como um grupo de crianças, em confo...

7 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:2018:20, 23 July 2022DG Regio talk contribs 46,700 bytes +26,689 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:3719:37, 2 December 2021DG Regio talk contribs 15,677 bytes +1,348 Created claim: summary (P836): Die Kinderbetreuungseinrichtung wird in Velvarská 121,Horoměřice, 252 62, betrieben. Die geplante Kapazität der Kinderbetreuungseinrichtung nach dem Übergang beträgt 12 Plätze. Wir wollen das Projekt vom 1.5.2017 bis zum 30.9.2019 umsetzen, von dem die erwartete Projektphase für den Umbau von Kinderbetreuungseinrichtungen vom 1.5.2017 auf den 30.9.2017, d. h. 5 Monate, liegt. Nach der Umwandlung wird die Einrichtung als Kindergruppe gemäß Gesetz...
  • curprev 19:3719:37, 2 December 2021DG Regio talk contribs 14,329 bytes +91 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 14,238 bytes +1,338 Created claim: summary (P836): La garderie sera exploitée à Velvarská 121, Horoměřice, 252 62. La capacité prévue de la garderie après la transition est de 12 places. Nous voulons mettre en œuvre le projet du 1.5.2017 au 30.9.2019, dont la durée prévue de la phase de projet pour la transformation des structures de garde d’enfants est du 1.5.2017 au 30.9.2017, soit 5 mois. Après la transformation, l’établissement sera exploité en tant que groupe d’enfants conformément à la loi...
  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 12,900 bytes +97 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:2021:20, 22 October 2020DG Regio talk contribs 13,256 bytes +1,310 Created claim: summary (P836): The childcare facility will be operated at Velvarská 121,Horoměřice, 252 62. The planned capacity of childcare facilities after transformation is 12 seats. We want to implement the project from 1.5.2017 to 30.9.2019, of which the project phase is expected to transform the child care facility from 1.5.2017 to 30.9.2017, i.e. 5 months. After the transformation, the facility will be operated as a children’s group according to Act No.247/2014 Coll....
  • curprev 21:2021:20, 22 October 2020DG Regio talk contribs 11,946 bytes −877 Removed claim: summary (P836): Childcare facilities will be operated in Velvarská 121, Horooměřice, 252 62. The planned capacity of the childcare facility after transition is 12 places. We want to implement the project from 1.5.2017 to 30.9.2019, of which the projected duration of the project phase for the transformation of childcare is between 1.5.2017 and 30.9.2017, i.e. 5 months. After the transformation, the equipment will be operated as children’s group pursuant to Act...

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:3009:30, 26 February 2020DG Regio talk contribs 11,534 bytes +877 Created claim: summary (P836): Childcare facilities will be operated in Velvarská 121, Horooměřice, 252 62. The planned capacity of the childcare facility after transition is 12 places. We want to implement the project from 1.5.2017 to 30.9.2019, of which the projected duration of the project phase for the transformation of childcare is between 1.5.2017 and 30.9.2017, i.e. 5 months. After the transformation, the equipment will be operated as children’s group pursuant to Act N...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020