Revision history of "Portusacek 2" (Q54258)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:0808:08, 13 October 2024DG Regio talk contribs 48,894 bytes +12 Set a claim value: summary (P836): Endereço de execução do projeto: Starokasárenská 192, 383 01 PrachaticeCapacidade das estruturas de acolhimento de crianças: 8 criançasCalendário total do projecto: 01.05.2017-31.10.2019, dos quais duração prevista da fase de projeto para a construção de estruturas de acolhimento de crianças: 01.05.2017-31.10.2017. Tipo de estabelecimento de prestação de cuidados a crianças em idade pré-escolar: grupo de crianças para o público (de acordo com a Lei...

23 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:1618:16, 23 July 2022DG Regio talk contribs 45,700 bytes +26,042 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:3419:34, 2 December 2021DG Regio talk contribs 15,275 bytes +1,411 Created claim: summary (P836): Adresse der Projektdurchführung: Starokasárenská 192, 383 01 PrachaticeKapazität der Kinderbetreuungseinrichtungen: 8 KinderGesamtplan des Projekts: 01.05.2017-31.10.2019, davon die voraussichtliche Dauer der Projektphase für den Bau von Kinderbetreuungseinrichtungen: 01.05.2017-31.10.2017.Art der Kinderbetreuungseinrichtungen im Vorschulalter: Kindergruppe für die Öffentlichkeit (gemäß Gesetz Nr. 247/2014 Slg. über die Bereitstellung von Kinder...
  • curprev 19:3419:34, 2 December 2021DG Regio talk contribs 13,864 bytes +73 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 13,791 bytes +1,434 Created claim: summary (P836): Adresse de mise en œuvre du projet: Starokasárenská 192, 383 01 PrachaticeCapacité des structures de garde d’enfants: 8 enfantsCalendrier total du projet: 01.05.2017-31.10.2019, dont la durée estimée de la phase du projet de construction de structures de garde d’enfants: 01.05.2017-31.10.2017.Type de garderies d’enfants d’âge préscolaire: groupe d’enfants pour le public (conformément à la loi no 247/2014 Coll., relative à la prestation de servic...
  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 12,357 bytes +73 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:2021:20, 22 October 2020DG Regio talk contribs 12,732 bytes +1,304 Created claim: summary (P836): Project implementation address: Starokasárenská 192, 383 01 PrachaticeCapacity of childcare facilities: 8 childrenTotal timetable of the project: 01.05.2017-31.10.2019, of which expected length of the project phase for the construction of childcare facilities: 01.05.2017-31.10.2017. Type of care facility for pre-school children: children’s group for the public (according to Act No. 247/2014 Coll., on the provision of childcare services in a chil...
  • curprev 21:2021:20, 22 October 2020DG Regio talk contribs 11,428 bytes −817 Removed claim: summary (P836): Project implementation address: Industrial barracks 192, 383 01 PachatieCapacity, childcare facilities: 8 Project Schedule: 01.05.2017-31.10.2019, of which the expected duration of the design phase for the construction of childcare facilities: 01.05.2017-31.10.2017.Type of pre-school childcare facility: children’s Group for the Public (pursuant to Act No. 247/2014 Coll., on the provision of childcare services for children). for the public, rem...

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:3009:30, 26 February 2020DG Regio talk contribs 10,956 bytes +817 Created claim: summary (P836): Project implementation address: Industrial barracks 192, 383 01 PachatieCapacity, childcare facilities: 8 Project Schedule: 01.05.2017-31.10.2019, of which the expected duration of the design phase for the construction of childcare facilities: 01.05.2017-31.10.2017.Type of pre-school childcare facility: children’s Group for the Public (pursuant to Act No. 247/2014 Coll., on the provision of childcare services for children). for the public, Addin...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020