Revision history of "Honey bear." (Q54205)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 10:4910:49, 12 October 2024DG Regio talk contribs 48,197 bytes −2 Changed label, description and/or aliases in pt
  • curprev 10:4910:49, 12 October 2024DG Regio talk contribs 48,199 bytes +1 Set a claim value: summary (P836): O grupo de crianças será operado em Dědina 5 Ostrožská Nová Ves, 687 22. Neste grupo, o número total de crianças será 12. O início do projeto está previsto para 1.5.2017, altura em que terá início a fase de construção, que decorrerá até 31.10.2017, ou seja, um total de 6 meses. A fase operacional terá lugar a partir de 1. 11. de 2017 a 31.10. 2019. O grupo de crianças funcionará após o registo do grupo de crianças em conformidade com a Lei n.o 247/2...

20 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:0818:08, 23 July 2022DG Regio talk contribs 45,527 bytes +26,203 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:3619:36, 2 December 2021DG Regio talk contribs 15,101 bytes +1,287 Created claim: summary (P836): Die Kindergruppe wird in Dědina 5 Ostrožská Nová Ves, 687 22, betrieben. In dieser Gruppe wird die Gesamtzahl der Kinder 12 sein. Der Projektbeginn ist für den 1.5.2017 geplant, ab dem die Bauphase bis zum 31.10.2017 beginnt, d. h. für insgesamt 6 Monate. Die Betriebsphase läuft ab 1. 11. 2017 bis 31.10. 2019. Die Kindergruppe wird nach der Registrierung der Kindergruppe gemäß Gesetz Nr. 247/2014 Slg. Die Anlage wird für die Öffentlichkeit betri...
  • curprev 19:3619:36, 2 December 2021DG Regio talk contribs 13,814 bytes +70 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 13,744 bytes +1,382 Created claim: summary (P836): Le groupe d’enfants sera exploité au Dědina 5 Ostrožská Nová Ves, 687 22. Dans ce groupe, le nombre total d’enfants sera de 12 ans. Le lancement du projet est prévu pour le 1.5.2017, date à laquelle la phase de construction débutera jusqu’au 31.10.2017, c’est-à-dire pour un total de 6 mois. La phase opérationnelle débutera à partir de 1. 11. De 2017 au 31.10. 2019. Le groupe d’enfants fonctionnera après l’enregistrement du groupe d’enfants confo...
  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 12,362 bytes +69 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 12,747 bytes +1,358 Created claim: summary (P836): Children’s group will be operated at Dědina 5 Ostrožská Nová Ves, 687 22. In this group, the total number of children will be 12. The start of the project is scheduled for 1.5.2017, when the construction phase will begin, which will take place until 31.10.2017, i.e. a total of 6 months. The operational phase will take place from 1. 11. 2017 to 31.10. 2019. The children’s group will function after the registration of the children’s group in accor...
  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 11,389 bytes −903 Removed claim: summary (P836): The children’s group will be operated at the site of Dědina 5 Nové Nová Ves, 687 22. The total number of children in this group will be 12. The start of the project is planned to take place at 1.5.2017, starting with a build-up phase of up to 31.10.2017, i.e. a total of 6 months. The operational phase will be running from 1. 11. 2017 to 31.10 2019. The children’s group will work after the inclusion of the child group in the register in accorda...

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:3309:33, 26 February 2020DG Regio talk contribs 11,011 bytes +903 Created claim: summary (P836): The children’s group will be operated at the site of Dědina 5 Nové Nová Ves, 687 22. The total number of children in this group will be 12. The start of the project is planned to take place at 1.5.2017, starting with a build-up phase of up to 31.10.2017, i.e. a total of 6 months. The operational phase will be running from 1. 11. 2017 to 31.10 2019. The children’s group will work after the inclusion of the child group in the register in accordanc...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020