Revision history of "Black Church children’s group of reason" (Q54178)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:0808:08, 13 October 2024DG Regio talk contribs 50,257 bytes −1 Changed label, description and/or aliases in pt
  • curprev 08:0808:08, 13 October 2024DG Regio talk contribs 50,258 bytes +26 Set a claim value: summary (P836): Grupo de razões para as crianças (desenvolvimento da aprendizagem e do pensamento) — funcionará no endereço Kutnohorská 582, 281 63 Kostelec nad Černými lesy, é um edifício situado num belo ambiente de um parque florestal nos arredores da cidade — a capacidade total da instalação será de 12 crianças — o projeto será lançado em 1.6.2017 e terminará em 31.12.2019, estando prevista a construção de uma instalação durante 7 meses — é uma instalação de pr...

22 March 2024

15 January 2024

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:0518:05, 23 July 2022DG Regio talk contribs 47,560 bytes +26,902 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:3519:35, 2 December 2021DG Regio talk contribs 16,016 bytes +1,430 Created claim: summary (P836): Kindergruppe Sense (Entwicklung des Lernens und Denkens) – wird in Kutnohorská 582, 281 63 Kostelec nad Černé les betrieben werden, es ist ein Gebäude, das sich in der schönen Umgebung des Waldparks am Rande der Stadt befindet – die Gesamtkapazität der Einrichtung wird 12 Kinder sein – das Projekt wird am 1. Juni 2017 gestartet und endet am 31.12.2019, von denen 7 Monate für den Bau einer Einrichtung geplant sind – es handelt sich um eine Kinder...
  • curprev 19:3519:35, 2 December 2021DG Regio talk contribs 14,586 bytes +101 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 14,485 bytes +1,465 Created claim: summary (P836): Groupe d’enfants de sens (Développement de l’apprentissage et de la pensée) — sera exploité à Kutnohorská 582, 281 63 Kostelec nad Černé les, c’est un bâtiment qui est situé dans le bel environnement du parc forestier à la périphérie de la ville-la capacité totale de l’établissement sera de 12 enfants — le projet sera lancé le 1er juin 2017 et se terminera le 31.12.2019, dont 7 mois sont prévus pour la construction d’un établissement — il s’agit...
  • curprev 21:3821:38, 28 November 2021DG Regio talk contribs 13,020 bytes +109 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 13,358 bytes +1,352 Created claim: summary (P836): Children’s group of reason (development of learning and thinking)-will be operated at the address Kutnohorská 582, 281 63 Kostelec nad Černými lesy, it is a building that is located in a beautiful environment of a forest park on the outskirts of the city-total capacity of the facility will be 12 children – the project will be launched 1.6.2017 and ended 31.12.2019, of which it is planned for 7 months to build a facility – it is a facility of car...
  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 12,006 bytes −918 Removed claim: summary (P836): The children’s group understood (development of learning and thought) -BUDE operating at Kutnohorská 582, 281 63 Kostelec above black forest, a building located in a beautiful lying environment on the outskirts of the total capacity of the installation will be 12 children — the project will start 1.6.2017 and end 31.12.2019, of which 7 months are planned to be built on the establishment of childcare facilities for children of the children’s pr...

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:3209:32, 26 February 2020DG Regio talk contribs 11,643 bytes +918 Created claim: summary (P836): The children’s group understood (development of learning and thought) -BUDE operating at Kutnohorská 582, 281 63 Kostelec above black forest, a building located in a beautiful lying environment on the outskirts of the total capacity of the installation will be 12 children — the project will start 1.6.2017 and end 31.12.2019, of which 7 months are planned to be built on the establishment of childcare facilities for children of the children’s pre-...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020