Revision history of "Children’s Group – Grandma II" (Q54165)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:0520:05, 12 October 2024DG Regio talk contribs 49,629 bytes +4 Changed label, description and/or aliases in pt
  • curprev 20:0520:05, 12 October 2024DG Regio talk contribs 49,625 bytes +6 Set a claim value: summary (P836): O projecto acolherá DS para 12 crianças dos 3 aos 6 anos de idade. O local de execução do projeto será 769/2C, 779 00 Olomouc e o horário de funcionamento previsto será das 19h00 às 16h30. A fase de construção terá início a partir de 1. 3. 2017 e decorrerá até 31. 8. 2017, 6 meses. Depois, será a partir de 1. 9. 2017 Iniciou-se a fase operacional, que terá a duração de 2 anos, ou seja, até 31. 8. 2019. A instalação destinar-se-á ao público em geral...

7 March 2024

15 January 2024

22 December 2023

6 July 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:0318:03, 23 July 2022DG Regio talk contribs 46,429 bytes +26,414 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:3619:36, 2 December 2021DG Regio talk contribs 16,652 bytes +1,333 Created claim: summary (P836): Das Projekt wird eine DS für 12 Kinder von 3 bis 6 Jahren betreiben. Der Standort des Projekts ist Družební 769/2C, 779 00 Olomouc und die voraussichtlichen Öffnungszeiten sind von 7.00 bis 16.30 Uhr. Die Bauphase beginnt ab 1. 3. 2017 und läuft bis 31. 8. 2017, d. h. 6 Monate. Es wird dann von 1 sein. 9. 2017 hat eine operative Phase von 2 Jahren begonnen, d. h. bis 31. 8. 2019. Die Einrichtung wird für die breite Öffentlichkeit konzipiert und...
  • curprev 19:3619:36, 2 December 2021DG Regio talk contribs 15,319 bytes +87 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 15,232 bytes +1,392 Created claim: summary (P836): Le projet exploitera une DS pour 12 enfants de 3 à 6 ans. L’emplacement du projet sera Družební 769/2C, 779 00 Olomouc et les heures d’ouverture prévues seront de 7 heures à 16 h 30. La phase de construction débutera à partir de 1. 3. 2017 et se déroulera jusqu’au 31. 8. 2017, c’est-à-dire six mois. Ce sera alors à partir de 1. 9. 2017, une phase opérationnelle de deux ans a débuté, c’est-à-dire jusqu’à 31 ans. 8. 2019. L’installation sera conçu...
  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 13,840 bytes +93 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 14,200 bytes +1,354 Created claim: summary (P836): The project will host DS for 12 children from 3 to 6 years of age. The place of implementation of the project will be 769/2C, 779 00 Olomouc and the expected opening hours will be from 7 to 16:30 p.m. The construction phase will begin from 1. 3. 2017 and will run until 31. 8. 2017, 6 months. Then it’s going to be from 1. 9. 2017 The operational phase started, which will last for 2 years, i.e. until 31. 8. 2019. The facility will be intended for...
  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 12,846 bytes −866 Removed claim: summary (P836): The project will run DS for 12 children between 3 and 6 years. The place of implementation of the project will be 769/2C, 779 00 Olomouc and the expected opening hours will be between 7 and 16: 30. The construction phase will start from 1. 3. 2017 and up to 31. 8. 2017, that is to say 6 months. It will then be 1. 9. The operational phase is 2017 and will run for 2 years, up to 31. 8. 2019. The facility will be addressed to the general public a...

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:3209:32, 26 February 2020DG Regio talk contribs 12,020 bytes +866 Created claim: summary (P836): The project will run DS for 12 children between 3 and 6 years. The place of implementation of the project will be 769/2C, 779 00 Olomouc and the expected opening hours will be between 7 and 16: 30. The construction phase will start from 1. 3. 2017 and up to 31. 8. 2017, that is to say 6 months. It will then be 1. 9. The operational phase is 2017 and will run for 2 years, up to 31. 8. 2019. The facility will be addressed to the general public and...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020