Revision history of "Royal kindergarten Strakonice I" (Q54152)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

11 June 2023

17 February 2023

23 July 2022

  • curprev 18:0218:02, 23 July 2022DG Regio talk contribs 47,258 bytes +27,529 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:2919:29, 2 December 2021DG Regio talk contribs 16,222 bytes +1,370 Created claim: summary (P836): Das Projekt wird eine Kindergruppe aufbauen und betreiben, die folgende Parameter hat – Adresse des Betriebsorts der Kinderbetreuungseinrichtung: Fabriknummer. 220 in Strakonice, P.C. 240 in CU. Neue Strakonice-Kapazität der Kinderbetreuungseinrichtungen: 12 Kinder – Zeitplan für das Projekt – Bau von Ausrüstung vom 1.5.2017 bis 30.4.2018; Betrieb der Einrichtung vom 1.5.2018 bis 30.4.2020 – Art der Kinderbetreuungseinrichtung im Vorschulalter:...
  • curprev 19:2919:29, 2 December 2021DG Regio talk contribs 14,852 bytes +97 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 14,755 bytes +1,368 Created claim: summary (P836): Le projet créera et exploitera un groupe d’enfants avec les paramètres suivants — adresse du lieu d’exploitation de la garderie: Numéro d’usine. 220 à Strakonice, C.P. 240 en UC. Nouvelle capacité Strakonice des structures de garde d’enfants: 12 enfants — calendrier du projet — construction d’équipements du 1.5.2017 au 30.4.2018; exploitation de l’installation du 1.5.2018 au 30.4.2020 — type de garderie d’âge préscolaire: groupe d’enfants selon...
  • curprev 21:3721:37, 28 November 2021DG Regio talk contribs 13,387 bytes +96 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 13,741 bytes +1,374 Created claim: summary (P836): As part of the project, a children’s group will be built and operated with the following parameters-address of the place of operation of the childcare facility: It’s a factory hon. 220 in Strakonice, p.r.s. 240 in k.ú. New Strakonice-capacity of childcare facilities: 12 children-harmonogram of the project – construction of equipment from 1.5.2017 to 30.4.2018; operation of the facility from 1.5.2018 to 30.4.2020-type of preschool childcare facil...
  • curprev 21:1421:14, 22 October 2020DG Regio talk contribs 12,367 bytes −917 Removed claim: summary (P836): The project will be built and operated by a child group with the following parametric address of the place of operation of the childcare facility: Factory chp. 220 in Strakonice, na po.p.n..240 in the cadastral district. New Strakonice-capacity of the childcare facility: 12 project timetable — construction of installations from 1.5.2017 to 30.4.2018; operation of an installation between 1.5.2018 and 30.4.2020 type early childhood care faciliti...

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:3209:32, 26 February 2020DG Regio talk contribs 11,592 bytes +917 Created claim: summary (P836): The project will be built and operated by a child group with the following parametric address of the place of operation of the childcare facility: Factory chp. 220 in Strakonice, na po.p.n..240 in the cadastral district. New Strakonice-capacity of the childcare facility: 12 project timetable — construction of installations from 1.5.2017 to 30.4.2018; operation of an installation between 1.5.2018 and 30.4.2020 type early childhood care facilities...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020