Revision history of "Children’s group Club" (Q53399)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:0308:03, 13 October 2024DG Regio talk contribs 48,927 bytes +1 Changed label, description and/or aliases in pt
  • curprev 08:0308:03, 13 October 2024DG Regio talk contribs 48,926 bytes +3 Set a claim value: summary (P836): Endereço do local de exploração da estrutura de acolhimento de crianças: Křížovnická 99/4, Cheb, 350 02capacidade das estruturas de acolhimento de crianças: 12 lugaresCalendário total do projecto: 1.3.2016-31.8.2018- cuja fase de projeto deverá ser transformada em estruturas de acolhimento de crianças: 1.3.2016-31.8.2016 Tipo de estabelecimento de prestação de cuidados a crianças em idade pré-escolar: grupo de crianças de acordo com a Lei n.o 247/20...

7 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

23 July 2022

  • curprev 16:1316:13, 23 July 2022DG Regio talk contribs 46,253 bytes +26,437 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:5019:50, 2 December 2021DG Regio talk contribs 16,484 bytes +1,335 Created claim: summary (P836): Anschrift des Betriebsorts der Kinderbetreuungseinrichtung: Křížovnická 99/4, Cheb, 350 02Kapazität von Kinderbetreuungseinrichtungen: 12 PlätzeGesamtplan des Projekts: 1.3.2016-31.8.2018- davon die voraussichtliche Dauer der Projektphase zur Umgestaltung von Kinderbetreuungseinrichtungen: 1.3.2016-31.8.2016 Art der Kinderbetreuungseinrichtung im Vorschulalter: Kindergruppe gemäß Gesetz Nr. 247/2014 Coll.form der Kinderbetreuungseinrichtungen au...
  • curprev 19:5019:50, 2 December 2021DG Regio talk contribs 15,149 bytes +82 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:2921:29, 28 November 2021DG Regio talk contribs 15,067 bytes +1,330 Created claim: summary (P836): adresse du lieu d’exploitation de la garderie: Křížovnická 99/4, Cheb, 350 02capacité des structures de garde d’enfants: 12 placeshoraire total du projet: 1.3.2016-31.8.2018- dont la durée estimée de la phase du projet de transformation des structures de garde d’enfants: 1.3.2016-31.8.2016 Type de garderie d’enfants d’âge préscolaire: groupe d’enfants selon la loi no 247/2014 Coll.form. des structures de garde d’enfants du point de vue des usage...
  • curprev 21:2921:29, 28 November 2021DG Regio talk contribs 13,737 bytes +88 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:3521:35, 22 October 2020DG Regio talk contribs 14,106 bytes +1,290 Created claim: summary (P836): address of the place of operation of the childcare facility: Křížovnická 99/4, Cheb, 350 02capacity of childcare facilities: 12 seatstotal timetable of the project: 1.3.2016-31.8.2018- of which the project phase expected to be transformed into childcare facilities: 1.3.2016-31.8.2016 type of care facility for pre-school children: children’s group according to Act No. 247/2014 Coll. form of childcare facility in terms of users: children’s group f...
  • curprev 21:3521:35, 22 October 2020DG Regio talk contribs 12,816 bytes −893 Removed claim: summary (P836): address of the place of operation of the childcare facility: Transversal 99/4, Cheb, 350 02Capacity of childcare facilities: 12 The overall timetable of the project will be as follows: 1.3.2016-31.8.2018- of which the expected duration of the design phase for the transformation of childcare facilities: 1.3.2016-31.8.2016 Type of childcare facility for early childhood: children’s group pursuant to Law No 247/2014 on the form of childcare facili...

21 September 2020

16 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 09:4909:49, 26 February 2020DG Regio talk contribs 12,009 bytes +893 Created claim: summary (P836): address of the place of operation of the childcare facility: Transversal 99/4, Cheb, 350 02Capacity of childcare facilities: 12 The overall timetable of the project will be as follows: 1.3.2016-31.8.2018- of which the expected duration of the design phase for the transformation of childcare facilities: 1.3.2016-31.8.2016 Type of childcare facility for early childhood: children’s group pursuant to Law No 247/2014 on the form of childcare faciliti...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020