Revision history of "TP OP VVV Information systems and investments" (Q52780)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

22 December 2023

19 June 2023

10 June 2023

17 February 2023

2 December 2022

23 August 2022

  • curprev 06:1806:18, 23 August 2022DG Regio talk contribs 48,137 bytes +27,362 Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, cs, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 19:5519:55, 2 December 2021DG Regio talk contribs 16,340 bytes +1,413 Created claim: summary (P836): Das Projekt konzentriert sich auf den Erwerb und die Entwicklung von Informationssystemen (IS) und die Bereitstellung technischer Ausrüstung mit Investitionscharakter, die für die erfolgreiche Verwaltung des operationellen Programms Forschung, Entwicklung und Bildung (OP VVV) notwendig sind. Die Systemintegration mit bereits bestehenden Informationssystemen wird sichergestellt, einschließlich der Anpassungen, die sich aus den Bedürfnissen und An...
  • curprev 19:5519:55, 2 December 2021DG Regio talk contribs 14,927 bytes +106 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 21:2321:23, 28 November 2021DG Regio talk contribs 14,821 bytes +1,405 Created claim: summary (P836): Le projet est axé sur l’acquisition et le développement de systèmes d’information (SI) et la fourniture d’équipements techniques à caractère d’investissement, qui sont nécessaires à la bonne gestion du programme opérationnel de recherche, de développement et d’éducation (OP VVV). L’intégration du système avec les systèmes d’information existants sera assurée, y compris leurs adaptations résultant des besoins et des besoins du personnel du PO, et...
  • curprev 21:2321:23, 28 November 2021DG Regio talk contribs 13,416 bytes +113 Changed label, description and/or aliases in fr: translated_label

28 October 2020

23 October 2020

22 October 2020

  • curprev 21:1221:12, 22 October 2020DG Regio talk contribs 13,747 bytes +1,331 Created claim: summary (P836): The project is focused on the acquisition and development of information systems (IS) and the provision of technical equipment of an investment character, which are necessary for successful administration of the Operational Programme Research, Development and Education (OP VVV). System integration with existing information systems will be ensured, including their adaptations stemming from the needs and requirements of OP staff and will be mainta...
  • curprev 21:1221:12, 22 October 2020DG Regio talk contribs 12,416 bytes −872 Removed claim: summary (P836): The project focuses on the acquisition and development of information systems (IS) and the provision of technical equipment of investment which is necessary for the successful administration of the Operational Programme Research, Development and Education (OP VVV). It will secure systemic integration with already existing information systems, including those from the needs and requirements of OP staff and will maintain information systems in c...

21 September 2020

16 July 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 08:5108:51, 26 February 2020DG Regio talk contribs 11,606 bytes +872 Created claim: summary (P836): The project focuses on the acquisition and development of information systems (IS) and the provision of technical equipment of investment which is necessary for the successful administration of the Operational Programme Research, Development and Education (OP VVV). It will secure systemic integration with already existing information systems, including those from the needs and requirements of OP staff and will maintain information systems in con...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020