Revision history of "(16807.19102018.132000852) SUSTAINABLE PROCESS ANALYSIS" (Q4938599)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 07:2607:26, 13 October 2024DG Regio talk contribs 44,144 bytes −2 Changed label, description and/or aliases in pt
  • curprev 07:2607:26, 13 October 2024DG Regio talk contribs 44,146 bytes −36 Set a claim value: summary (P836): O BCN DECIDIU COMPROMETIR ESTE PROJECTO PARA AUMENTAR A QUALIDADE? E o Rendimento? DO SEU PRODUTO, IDENTIFICA AÇÕES DESTINADAS A OPTIMIZAR OS PROCESSOS DE PRODUÇÃO, CRIAR DADOS BÁSICOS DAS NECESSIDADES REAIS? O BCN TANNERY DECIDIU UTILIZAR COMPOLAB PARA: 1) VERIFICAR AS ZONAS DE PROCESSO DE INTERESSE PRIORITÁRIO; 2) IDENTIFICAR AS VÁRIOS PLANTAS E MÁQUINAS I?POINTS? RECOLHA SIGNIFICATIVA DE PARÂMETROS/VALUAS;3) AVALIAR AS SOLUÇÕES A ADOPTAR EM TERMO...

7 March 2024

10 June 2023

26 April 2023

10 April 2023