Revision history of "(11429.27102016.098000281) Q&S OF RAILWAY PARTS" (Q4934847)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 19:3019:30, 12 October 2024DG Regio talk contribs 45,416 bytes +8 Changed label, description and/or aliases in pt
  • curprev 19:3019:30, 12 October 2024DG Regio talk contribs 45,408 bytes −3 Set a claim value: summary (P836): O PROJECTO É DESENVOLVIDO EM 3 LINHAS DE DIREÇÃO: 1) DESENVOLVIMENTO DE UM SISTEMA DE GESTÃO DIN6701 PARA A CONCEÇÃO, O CONTROLO DO FABRICO E O ENSAIO DO PROCESSO DE COLHEITA DAS CONSTRUÇÕES FERROVIÁRIAS NO INTERESSE DAS PARTES INTERESSADAS NO SPA CIESSE 2) INTEGRAÇÃO DO SISTEMA DE GESTÃO DIN6701 COM O SISTEMA DE GESTÃO DA QUALIDADE? E O SISTEMA IRIS EXISTENTE 3) REVISÃO DOS PROCESSOS PREVISTOS PELO SISTEMA DE GESTÃO INTEGRADA PARA O DESENVOLVIMENTO...

22 March 2024

10 June 2023

26 April 2023

10 April 2023