Revision history of "(10360.14072017.115000263) PROJECT 23/2018_SCUOLA PONTE A EGOLA" (Q4934515)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 19:2719:27, 12 October 2024DG Regio talk contribs 44,076 bytes −3 Set a claim value: summary (P836): REALIZAÇÃO DA INSULAÇÃO TÉRMICA EM TODA A EDIFÍCIO ESCOLAR E INTERVENÇÃO NO SISTEMA TÉRMICO COM A SUBSTITUIÇÃO DA CALdeira, O Ginásio Intervém MELHORANDO A INSULAÇÃO DA CALÇAdeira. NO EDIFÍCIO ESCOLAR É PROPOSTA A FORMAÇÃO DE UMA PAC DE AQUECIMENTO? Nas áreas da maçonaria, tanto na face como na pastelaria, com um espesso de CM. 10 ACABADOS E REVESTIDOS; Sobre a capa do HUT e do PAVILION? A COLOCAÇÃO DOS PAINÉIS EXPANDIDOS DE POLISTIRENO DE CM. 10 ES...

7 March 2024

10 June 2023

26 April 2023

10 April 2023