Revision history of "(10360.14072017.115000152) PRIMARY AND KINDERGARTEN SCHOOL STICCIANO STOPOVER" (Q4934446)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 19:2719:27, 12 October 2024DG Regio talk contribs 46,948 bytes −8 Changed label, description and/or aliases in pt
  • curprev 19:2719:27, 12 October 2024DG Regio talk contribs 46,956 bytes −52 Set a claim value: summary (P836): AS INTERVENÇÕES PREVISTAS PELO PROJETO NA ESCOLA SÃO:? INSULAÇÃO DE MURAS PERIMETRO EXTERNAS DO INTERIOR: Vem aí? REALIZADO A PARTIR DO INTERIOR PELA APLICAÇÃO DE UM TIPO DE ESTIFERITE RP OU SEMELHANTE CONSTITUÍDO POR UM PAINEL SANDWICH CONSTITUÍDO POR UM COMPONENTE INSULTANTE EM ESPESSURA MÍNIMA DE FOAM POLIISO 8CM, EXPANDIDO SEM UTILIZAÇÃO DE CFC OU HCFC, REVESTIDO NUM LADO COM UM REVESTIMENTO DE GÁS DE ÁGUA MÚLTIL E SOBRE A SUPERFÍCIE VISÍVEL REV...

7 March 2024

10 June 2023

26 April 2023

10 April 2023