Revision history of "INTEGRATED PROJECT OF RELIEF, GIS RETURN, DYNAMIC HYDRAULIC MODELING, INSTALLATION OF VALVES AND MEASURING INSTRUMENTS, DISTRICTISATION, PRE-LOCATION AND IDENTIFICATION OF LEAKS AND SUBSEQUENT REPLACEMENT OF SECTIONS, IN RELATION TO THE WATER DISTRIBUTION" (Q4863335)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 17:2917:29, 12 October 2024DG Regio talk contribs 67,416 bytes −7 Changed label, description and/or aliases in pt
  • curprev 17:2917:29, 12 October 2024DG Regio talk contribs 67,423 bytes +22 Set a claim value: summary (P836): A acção destina-se a reduzir as perturbações hídricas e a melhorar a qualidade do serviço prestado aos cidadãos, criando igualmente as bases para um avanço significativo na capacidade de gerir o património da infra-estrutura hídrica de uma forma sustentável, com base nas melhores tecnologias disponíveis, nas melhores práticas internacionais e em conformidade com os princípios e orientações adoptados pela União Europeia, em consonância com os princíp...

7 March 2024

12 June 2023

26 April 2023

10 April 2023