Revision history of "COMPLETION OF THE NETWORK STRUCTURE" (Q4827351)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 16:3716:37, 12 October 2024DG Regio talk contribs 29,132 bytes +25 Set a claim value: summary (P836): REALIZAÇÃO DA CONECTIVIDADE DO INSTITUTO QUE VOCÊ QUERE OBTER A SEMELHANTE E A SERVIÇO DE CABOS DE TODO O INSTITUTO ATRAVÉS DE CABINETES DE DADOS DA REDE DE DISPOSITIVOS ATIVOS COMPLETOS COM COM COMUTADOR. INSTITUIR UMA REDE SEGURANÇA DE PONTOS DE ACESSO COM CONTROLO CENTRALIZADO DO SOFTWARE. REDE ARMADA DO INSTITUTO DE CONCLUSÃO

7 March 2024

12 June 2023

26 April 2023

10 April 2023