Revision history of "WIRING A BRIDGE FOR THE FUTURE" (Q4825080)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 07:3107:31, 12 October 2024DG Regio talk contribs 43,189 bytes +1 Changed label, description and/or aliases in pt
  • curprev 07:3107:31, 12 October 2024DG Regio talk contribs 43,188 bytes +78 Set a claim value: summary (P836): CONSTRUÇÃO DE UMA REDE SEGURA POR MEIOS DE PONTOS DE ACESSO PROFISSIONAL GERIDOS ATRAVÉS DE CONTROLADORES VIRTUAIS E DE COMUNICADORES GERIDOS. GESTÃO AVANÇADA DO ACESSO À REDE POR MEIOS DE HOTSPOTS. Este projecto colocará à disposição dos professores e abastecer-se-á de uma infra-estrutura de rede Wi-Fi controlada e gerida centralmente que permitirá a distribuição em rede dos recursos informáticos do instituto, incluindo o acesso à Internet. A soluç...

22 March 2024

12 June 2023

26 April 2023

10 April 2023