Revision history of "A CABLING FOR THE FUTURE" (Q4823828)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 07:2607:26, 12 October 2024DG Regio talk contribs 33,282 bytes −4 Changed label, description and/or aliases in pt
  • curprev 07:2607:26, 12 October 2024DG Regio talk contribs 33,286 bytes −7 Set a claim value: summary (P836): O PROJECTO ENVOLVE O ENCARGAMENTO DE PLEXOS QUE NÃO TENHAM CONECTIVIDADE E A ADAPTAÇÃO ÀS NOVAS NORMAS DA BOA ESCOLA A 30 MBSI UTILIZANDO UM SISTEMA DE CONECTIVIDADE RÁPIDO E FIÁVEL, NO QUE DIZ RESPEITO À SEGURANÇA DOS DADOS E À PREVENÇÃO DO ACESSO A SÍTIOS NÃO PROVIDOS E À CRIAÇÃO DE LIGAÇÕES SEGURAS. FILTERING NO INPUT POR BLOQUEAR O UTILIZADOR ANTES DE ENTRAR NA REDE. ATAQUES DE BLOQUEAMENTO POR NAVEGAÇÃO DE ATPFILADORES DE INTRUSÃO VIRUS.FIREWALL

22 March 2024

12 June 2023

26 April 2023

10 April 2023