Revision history of "REALISATION OF WIFI COVERAGE SCHOOLS INSTITUTE INCLUDING BOBBIOHTTPPON20142020.INDIRE.ITBAND" (Q4822242)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 07:1607:16, 12 October 2024DG Regio talk contribs 42,143 bytes +7 Changed label, description and/or aliases in pt
  • curprev 07:1607:16, 12 October 2024DG Regio talk contribs 42,136 bytes −142 Set a claim value: summary (P836): Este projecto colocará à disposição dos professores e fornecerá uma infra-estrutura de rede Wi-Fi que permita o acesso à Internet a todos os utilizadores. A CONFIGURAÇÃO DA REDE DEVE ADOPTAR OS DISPOSITIVOS DE PONTO DE ACESSO E DE SEMELHANTES DAS PRINCIPAIS MARCAS INTERNACIONALMENTE RECONHECIDAS COM BANDA DUPLA24 GHZ COM A INSTALAÇÃO DE CABINAS DE RACK DA INTERFACE DA REDE GIGA POE 11N 300 MBPS NAS VÁRIOS LOCAÇÕES DA ÁREA EM QUE AS CÁBLICAS DE REDE...

7 March 2024

19 June 2023

12 June 2023

26 April 2023

10 April 2023