Revision history of "WE ENTER THE NETWORK" (Q4821622)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 07:1407:14, 12 October 2024DG Regio talk contribs 35,888 bytes −34 Set a claim value: summary (P836): O INSTITUTO ILLUMINATOCIRINO PRETENDE CONSTRUIR UMA INFRAESTRUTURA DE REDE SEMELHANTE COM A AJUDA DOS FUNDOS ESTRUTURAIS EUROPEUS PARA ABRANGER TODA A ÁREA ESCOLAR DE ambos os PLEXOS. Na realidade, a intenção do projecto de equipar as duas escolas com um total de 12 pontos de acesso e equipamentos de rede necessários para cobrir todas as classes do instituto e as zonas comuns do Leste. E INT.PALESTRE THEATER ETC... Além disso, com o necessário equip...

23 March 2024

12 June 2023

26 April 2023

10 April 2023